|
Performance Of Construction Works As Part Of The Task Titled: Psary - Access Road To Agricultural Land The Subject Of The Order Is The Performance Of Construction Works As Part Of The Task Titled: Psary - Access Road To Agricultural Land. The Investment Includes The Reconstruction Of The Public Municipal Road No. 100845D From Psary To Zawiszów, On A Section Approximately 955 M Long. The Road Covered By The Order Is A Public, Municipal Road, Class D, With Traffic Category Kr1-2. The Works Will Be Carried Out Within The Boundaries Of Registered Plots No. 185/1, 352 And 26, In The Jemielno Commune, Górowski District, Lower Silesian Voivodeship. The Scope Of The Order Includes, Among Others: − Measurement Works - Approx. 0.955 Km, − Preparatory And Demolition Works, Including Cutting And Milling Of The Existing Bituminous Surface, − Surface Of The Reconstructed Road - Layer Binding Layer Made Of A Mineral-Bituminous Mixture With An Average Thickness Of 4 Cm - Approx. 3,335.00 M² And A Wearing Course Made Of A Mineral-Bituminous Mixture With A Thickness Of 4 Cm - Approx. 3,335.00 M², - Cutting Of Existing Roadsides - Approx. 2,292.00 M², - Roadsides With A Crushed Stone Surface, Thickness 12 Cm - Approx. 1,423.00 M², - Construction Of Sewage From Prefabricated Concrete Elements - Approx. 20.00 M And Slope Sewage - Approx. 8.00 M, - Slopes Made Of Crushed Aggregate - 75.00 M², - Slopes Made Of Asphalt Concrete - Aggregate Base And Surface Made Of Mineral-Bituminous Mixtures - Approx. 223.00 M², − Construction Of A Passing Area With Sub-Base And Surface Made Of Mineral-Bituminous Mixtures – 67 M2 − Construction Of Pipe Culverts Ø400 Mm From Corrugated Pipes With Stiffness Sn8 – A Total Of Approx. 22.00 M, Including End Walls And Protection With Openwork Slabs, − Cleaning And Desilting Of Ditches Along With Profiling The Bottom And Slopes – Approx. 580.00 M, − Mechanical Mowing Of Grass And Lichens From Slopes - Approx. 872.00 M², − Grubbing Up Of Groves Along With Shredding, Removal And Disposal - Approx. 0.05 Ha, − Construction Of Road Traffic Safety Elements, Including Vertical Markings And A Steel Protective Barrier, − Topsoiling And Sowing Of The Areas After The Works And Tidying Up The Area - 755 M2the Works Should Be Performed In Accordance With The Design Documentation Together With The Supporting Bill Of Quantities, Technical Specifications For The Execution And Acceptance Of The Works, Provisions Of The Swz And Answers To Questions, If Any, Appear In The Procedure And Will Be Published On The Website Where The Procedure Is Conducted, And With The Contractors Offer. The Contractor Will Introduce Temporary Traffic Organization For The Duration Of The Construction Works And Will Provide Surveying Services Along With Carrying Out A Post-Construction Surveying Inventory. The Detailed Scope And Method Of Performing The Works Are Specified In The Design Documentation For The Task Titled Reconstruction Of The Municipal Road No. 100845D Psary-Zawiszów,
|