|
Structural Shell Work – Municipality Of Bissendorf / New Wissingen Primary School - Extended Shell Work (Ve 301). The Municipality Of Bissendorf Is Planning To Build A New School In The Town Of Wissingen. The Property Of The School And The Construction Project Is Located On Nobodys Way In 49143 Bissendorf. With The Planning Of The Planned Construction Work For A New Building, A Two-Class Elementary School With All-Day Activities, A Cafeteria And Administration Is To Be Built. The Planning Area For The New School Building Is Located North Of Mindener Strasse, Between Nobodysweg And Bahnhofstrasse. The Existing Church Buildings In The Construction Site Were Demolished In Advance Of The Construction Work For The New Building, With The Exception Of The Church Tower. This Remains On The Construction Site As An Identity-Creating Element. The Planned School Building Consists Of Three Structures Or Components (Bt), Which Are Connected By A Common Foyer And Have The Following Approximate Dimensions (Length/Width/Height): * Bt1: L/W/H 26/25/9.40 M, Two-Story, * Bt2: L/W/H 26/25/9.40 M, Two-Story, * Bt3: L/W/H 30/23/6.90 M, Single Storey (Elevated). The Floor Area Of The Building Including The Foyer Is Approximately 2,260 M2. The Supporting Structure Is Planned As A Solid Construction Made Of Reinforced Concrete, Including The Stairs. The Foundation Is Carried Out On Individual And Strip Foundations. The Surrounding Parapets To The Flat Roofs Form The Upper End Of The Building. The Subject Of This Award Procedure Is The Extended Shell Construction Work Required For This. Essential Services (Approx. Information) Are: * Construction Site Equipment: - Higher-Level Construction Site Equipment (Preparation Of Areas, Construction Site Fences, Construction Site Containers, Tower Cranes, Construction Water, Construction Heating, Construction Electricity And Construction Lighting), Retention Period 20 Months, For The Client/Other Entrepreneurs, * Earthworks And Foundation Work: - 1800 M3 Of Topsoil Removal, Including Disposal - 1400 M3 Of Earth Excavation Work For Construction Pit, Shafts, Trenches, Including Disposal - 550 M3 Of Filter Layer, - 250 M3 Of New Floor Delivery And Installation * Building Sealing: - 1700 M2 Of Perimeter Insulation Under The Floor Slab, Including Cleanliness Layer, Separating Layers, - 430 M2 Of Sealing Work On Vertical Surfaces (Floor Slab, Base) With Bitumen Thick Coating * Scaffolding Work (Partly For Ag/Others Entrepreneur): - 3000 M2 Of Work/Facade Scaffolding In Load Class 4, Height Up To 10 M, Retention Time Approx. 8 Months, - Including Individual Mobile Scaffolding, - 15000 M3 Of Load-Bearing Scaffolding In Design Class B, Including Retention Time For Concreting Work, * Concrete Work, Including Formwork: - 2100 M2 Floor Slab Made Of In-Situ Concrete, With Strip Foundations - 60 St. Supports Made Of In-Situ Concrete, - 2700 M2 Walls Made Of In-Situ Concrete, - 3500 M2 Ceiling Panels Made Of In-Situ Concrete, With Joists, - Various Staircases Made Of Prefabricated Concrete Parts, - 250 T Of Reinforcing Steel, - Including Various Built-In Parts: Punching Shear Reinforcements, Joint Sheets, Etc. - Individual Core Drillings * Masonry Work: - 340 M2 Of Interior Walls Made Of Sand-Lime Brick * Technical Building Equipment (Tga): - 200 M Underground Pipes Made Of Solid Wall Pipe. This Work Is Scheduled To Be Carried Out From November 23Rd, 2026 To March 2028. The Following Apply
|