Tender For Civil Work In Qtr No H-591 Section Iii Under Sub Dn Gandhi Nagar I Jaipur (Sanction Work)- 1 Carriage Of Material Building Rubbish Stone Metal (Grit And Ballast Etc.) Including Loading And Unloading For 10 Km. 2 Grading Roof For Water Proofing Treatment With Water Proffing Compound Cement Concretee 1:2:4 (1 Cement : 2 Coarse Sand : 4 Graded Stone Aggregate 20 Mm Nominal Size) 3 Providing Gola 75X75 Mm In Cement Concretee 1:2:4 (1 Cement : 2 Coarse Sand : 4 Stone Aggregate 10Mm And Down Gauge) Including Finishing With Cement Mortar 1:3 (1 Cement : 3 Fine Sand) As Per Standard Design : 4 Providing & Laying Broken Glazed Titles On Roof ( Broken Glazed Tiles Not Less Than 9 Kg/Sqm) On Top Of Hot Bitumen @ 1.7 Kg/Sqm. (1.40 Kg Of Vg-40 (30/40 )Grade And 0.30 Kg/Sqm. Of Vg-10 (80/100) Grade) And Joints Filled With Cement Mortar 1 :2 (1 Cement:2 Marble Dust Mixed With Water Proofing Compund All Complete As Per Direction Of Engineer-In-Charge. 5 Kota Stone Slab Flooring 25 Mm Thick Over 20 Mm (Average) Thick Base Laid Over And Jointed With Grey Cement Slurry Mixed With Pigment To Match The Shade Of The Slab Including Rubbing And Polishing Complete With Base Of Cement Mortar 1 : 4 (1 Cement : 4 Coarse Sand) For Area Of Each Slab From 901 To 2000 Sq.Cm : 6 Plaster On New Surface On Walls In Cement Sand Mortar 1:4 Including Racking Of Joints Etc. Complete Fine Finish : 20Mm Thick . 7 Colour Washing Of All Shades To Give An Even Shade Including All Scaffolding : Removing White Or Colour Wash By Scrapping And Sand Papering And Preparing The Surface Smooth Including Necessary Repairs To Scratches By Sandla/Loi. (Only For Colour Changing ). 8 Distempering With Oil Bound Washable Distemper Of Approved Brand And Manufacture To Give An Even Shade Including All Scaffolding: Old Work (One Or More Coats) Including Scrapping Surface And Necessary Repairs. Colour Change 9 Applying One Coat Of Cement Primer Of Approved Brand And Manufacture On Wall Surface Including All Scaffolding: 10 Demolishing Brick Work Manually/ By Mechanical Means Including Stacking Of Serviceable Material And Disposal Of Unserviceable Material Within 50 Metres Lead As Per Direction Of Engineer-In-Charge. In Cement Mortar. 11 Providing And Laying App (Atactic Polypropylene Polymer) Modified Prefabricated Five Layer 3Mm Thick Water Proofing Membrane, Black Finished Reinforced With Glass Fiber Matt Consisting Of A Coat Of Bitumen Primer For Bitumen Membrane @ 0.40 Itr/Sq.Mt. By The Same Membrane Manufacture Of Density At 25°C, 0.87-0.89 Kg/Ltr And Viscosity 70-160 Cps. Over The Primer Coat The Layer Of Membrane Shall Be Laid Using Butane Torch And Sealing All Joints Etc., And Preparing The Surface Complete. The Vital Physical And Chemical Parameters Of The Membrane Shall Be As Under Joint Strength In Longitudinal And Transverse Direction At 23°C As 650/450N/5Cm. Tear Strength In Longitudinal And Transverse Direction As 300/250N. Softening Point Of Membrane Not Less Than 150°C. Cold Flexibility Shall Be Upto -2°C When Tested In Accordance With Astm, D-5147. The Laying Of Membrane Shall Be Got Done Through The Authorized Applicator Of The Manufacturer Of Membrane. 3 Mm Thick 12 Providing And Fixing In Cm 1 : 4 Double Paitam (Rebated) Stone Door Window And Ventilator Frames Of Approved Quarry: Size 125 X 100Mm 13 Providing And Laying Water Proofing Treatment On Roofs Of Slabs By Applying Cement Slurry Mixed With Water Proofing Cement Compound Consisting Of Applying : I) After Surface Preparation, First Layer Of Slurry Of Cement @ 0.488 Kg/Sqm Mixed With Water Proofing Cement Compound @ 0.253 Kg/Sqm. Ii) Laying Second Layer Of Fiber Glass Cloth When The First Layer Is Still Green . Overlaps Of Joints Of Fiber Cloth Should Not Be Less Than 10 Cm . Iii) Third Layer Of 1.5 Mm Thickness Consisting Of Slurry Of Cement @ 1.289 Kg/Sqm Mixed With Water Proffing Cement Compound @ 0.670 Kg/Sqm And Coarse Sand @ 1.289 Kg/Sqm. This Will Be Allowed To Air Cure For 4 Hours Followed By Water Curing For 48 Hours. The Entire Treatment Will Be Taken Upto 30Cm On Parapet Wall And Tucked Into Groove In Parapet All Around Iv) Fourth And Final Layer Of Brick Tiling ‘With Cement Mortar Or Any Other Approved Protective Coarse. (Which Will Be Paid For Separately) For The Purpose Of Measurement The Entire Treated Surface Will Be Measured 14 Brick Work With F.P.S. Bricks Of Class Designation 75 In Superstructure Above Plinth Level Upto Floor V Level In All Shapes And Sizes In : Cement Mortar 1 : 6 (1 Cement : 6 Coarse Sand) 15 Supplying And Fixing Stone Lintels/Bed Plates Of Approved Quarry Rough Dressed In Cement Mortar 1:4 : Upto 15 Cm. Thick.
Contact Information
Contact Person
EXECUTIVE ENGINEER PWD CITY DN III JAIPUR
Address
EXECUTIVE ENGINEER PWD CITY DN III JAIPUR
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 116949249
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.