1. The Subject Of The Order Are Construction Works Carried Out As Part Of The Investment Task Entitled: Thermal Modernization Of The Building Of The Volunteer Fire Department In Skowroda Północna In The Chąśno Commune.2. Address And Location Of The Subject Of The Order: Address: Skowroda Północna 24Adz. Registry Number: 147/1, Registry District 0014 Skowroda, Registry Unit 100503_2 Chąśnowoj. Łódź Voivodeship, Poviat: Łowicz3. The Subject Of The Order Is The Performance Of Thermal Modernization Works On The Building Of The Volunteer Fire Department In Skowroda Północna, Consisting In Particular Of The Following Works: 1) Demolition Works - Disassembly Of Existing Window And Door Joinery, 2) Installation Of New Window And Door Joinery, 3) Insulation Of External Walls With Polystyrene Boards, 4) Execution Of Thin-Layer Facade Plaster, 5) Dismantling Of Existing Flashings Sheet Metal Work,6) Making And Installing New Sheet Metal Flashings,7) Dismantling The Existing Roofing Made Of Trapezoidal Steel Sheets,8) Making Thermal Insulation Of The Attic,9) Installing A New Roof Covering,10) Dismantling Old Gutters And Downpipes,11) Installing New Gutters And Downpipes,12) Dismantling External Concrete Stairs,13) Making New Stairs Made Of Concrete Blocks,14) Dismantling The Existing Hardening From Concrete Slabs,15) Hardening Part Of The Area With Concrete Blocks,16) Internal Painting Of Walls And Ceilings,17) Dismantling The Old Eaves Soffit And Making New Ones From Pvc Panels,18) Reconstruction Of The Internal Electrical Installation,19) Cleaning Works,20) Delivery And Installation Of Air-Air Heat Pumps - 4 Sets,21) Delivery And Installation Of Pv Panels On The Garage Building.The Contractors Tasks Also Include: - Preparation Of Documentation As-Built - Performing A Subcontracting Surveying Inventory4. A Detailed Description Of The Subject Of The Order Is Specified In The Annexes To The Swz: 4.1. Annex No. 9 To The Swz - Technical Specifications For The Execution And Acceptance Of Works (Hereinafter Referred To As Stwiorb)4.2. Annex No. 10 To Swz - Bill Of Quantities (Auxiliary)4.3. Annex No. 11 To The Swz - Design Documentation, Taking Into Account The Explanations Provided During The Public Procurement Procedure, Provided That If The Content Of The Design Documentation And Stwiorb Contains Any Provisions Regarding Warranty Periods, On-Site Inspection Or Regarding The Conditions For The Implementation Of The Subject Of The Contract, In Particular The Rules For Introducing Additional Or Replacement Works, Acceptance Of Works, Settlement Method, Which Are Not Reflected In The Content Of This Swz And Annex No. 5 To The Swz - Draft Contract Or Are Related To Them Contradictory, The Provisions Of The Swz And The Draft Agreement Constituting An Annex To The Swz Should Be Accepted As Binding.5. Warranty:5.1. The Length Of The Quality Warranty Period For Completed Construction Works, Built-In Materials And Installed Devices Is Min. 36 Months From The Date Of Si
|