1. The Subject Of The Order Is The Execution Of An Investment Task Called Changing The Use Of A Former School Building In Wólka Orłowska Through Its Adaptation Into Residential Premises. 2. The Subject Of The Order Includes The Following: Elements Of The Works:2.1 General Construction Works:1) Demolition Works Of The Existing Toilet And Septic Tank,2) Staircase And Elevator Shaft - Shell State,3) Staircase And Elevator Shaft - Roof And Covering,4) Staircase And Elevator Shaft - Finishing Works5) Delivery And Installation Of The Elevator,6) Disassembly And Demolition Works Of The Existing Building7) Renovation Works Of Walls, Ceilings, Plasters And Cladding,8) Window And Door Joinery,9) Subfloors And Floors,10) Renovation Of The Roof And Covering,11) Insulation Of The Plinth Walls Below The Ground,12) Insulation Of The Plinth Walls Above The Ground,13) Insulation Of The Walls And Construction Of The Façade,14) Permanent Equipment Of Bathrooms And Toilets,15) External Works,16) Hardening Of The Area (Exit, Passage Road, Parking Lot) 2.2 Sanitary Works: 1) Water Supply Installation, 2) Sanitary Sewage Installation, 3) Connections And Sewage Disposal, 4) Central Heating Installation, 5) Heat Source And Fittings, 6) Ventilation Installation, 7) Assembly Works Of Sanitary Installations 2.3 Electrical Installations: 1) External Lighting, 2) Measuring Connectors, Wlz And Switchboards, 3) Lighting And Sockets Installation,4) Electrical Installation Measurements,5) Elevator Shaft Installation,6) Photovoltaic Installation,7) Pv Installation Measurements,8) It Installation,9) Lightning Protection Installation,10) Intercom Installation,11) Cctv Monitoring,12) Television Installation,13) Additional Works.3. The General Scope Of Works Includes: 1) Demolition Works Of The Existing Toilet 2) Addition Of A Staircase And An Elevator Shaft 3) Elevator - Delivery And Assembly 4) Disassembly And Demolition Works (Removal Of Roofing And Ceilings On Single-Story Parts, Walls, 5) Partitions, Chimneys, Ground Floor Floors With Subfloors, First Floor Floors, External And Internal Plaster Coverings, Etc.), 6) Execution New Ceilings, Lintels And Walls In The Single-Story Part Of The Building, 7) Construction Of A Roof Covering Made Of Sloping Polystyrene In The Single-Story Part, As Well As A Roof Over The Designed Staircase And Elevator Shaft, 8) Construction Of A New Roof Covering With Polystyrene On The Two-Story Part Of The Building, 9) Rebuilding Of Chimneys Above The Roof Slope, 10) Replacement Of Windows And Doors, 11) Installing New Plasters On Walls And Ceilings After Chipping Off The Existing Ones, 12) Replacing Floors In The Rooms On The Ground Floor And First Floor, 13) Installing A Suspended Ceiling Made Of Plasterboards Above The Ground Floor And First Floor, 14) Installing Internal Balustrades In The Staircase, 15) Replacing Window Sills, 16) Painting Walls And Ceilings, 17) Execution Of Stoneware Tile Cladding In Bathrooms And Boiler Rooms, 18) Execution Of P
|