3.1. The Subject Of The Order In The Design And Build Formula Is: Adaptation Of Rooms In The Basement Of The State Fire Service Building In Stara Błotnica Into Emergency Shelter Rooms. The Renovated Facility Is An Educational Institution And Will Be Used In Such A Way, Therefore The Work Schedule Must Be Adjusted In Such A Way As Not To Disturb The Functioning Of The School. 3.2 Scope Of Works Of The Subject Of The Order: The Subject Of The Order Is The Performance Of Construction And Installation Works In A Building Located In Stara. Błotnica, On Plot No. 137/2, District 0001 Błotnica Stara, Stara Błotnica Commune, Including The Modernization Of Rooms In The Basement Of The Public Primary School In Stara Błotnica To The Parameters Of The Emergency Shelter (Mds) According To The Following Assumptions: 1) The Basic Function Remains School Functions, I.E. School Cloakrooms, Utility Rooms, Other School Rooms, Communication, 2) A Comprehensive Renovation Is Planned, 3) The Facility Is Located In The Basement Of The Building Brick With A Reinforced Concrete Ceiling,4) Modernization Includes Adaptation To The Requirements Of Civil Protection (Without The Full Parameters Of A Hermetic Shelter).5) Increasing The Resistance Of The Facility By Changing The Location Of The Fuel Storage Room And Modernizing The Boiler Room From Oil To Gas.6) Assumed Parameters To Be Achieved, Min. Mds Area: 350 M² + Communication + Sanitary Facilities, Height: Min. 2.4 M, Structure: Reinforced Concrete / Solid Brick, Lack Of Full Shelter Resistance (Reinforcements Necessary), No Filter And Ventilation Installation - To Be Done, Modernization Includes Installations, Sanitary Facilities, Equipment. The Scope Includes In Particular: 1) Construction Works (Renovation + Reinforcements) A) Local Removal Of Existing Plaster; B) Local Drying Of Building Partitions; C) Construction Of New Damp-Proof Insulation; D) Demolition Of Partition Walls; E) Construction Of Partition Walls F) Application Of New Plasters; G) Construction Of New Floors; H) Replacement Of Parts Of Joinery (Reinforced Doors And Windows); I) Strengthening The Structure (Lintels, Beams, Local Wall Thickening);J) Construction Of New Bathrooms With Toilets2) Construction Of Construction Installations Required For Mds:A) Electrical Installationb) Emergency Lighting;C) Water And Sewage Installation. (Secured);D) Mechanical Ventilation With The Possibility Of Emergency Operation;E) Simple Filter-Ventilation System (Not Full Shelter);F) Emergency Power Supply (Generator + Ats)G) Modernization Of The Central Heating Installation. General Requirements1) Design Documentation Should Be Developed In Accordance With Common Technical Rules And Good Practices, Regulations And Standards And Assuming That All Requirements Contained In This Fup Are Met,2) Design Documentation Must Be Made In A Manner Consistent With The Principles Of Modern Technical Knowledge, Applicable Regulations, Including Technical, Construction And Environment
Contact Information
Address
Gmina Stara Błotnica,Stara Błotnica,26-806,Mazowieckie,Pl921 - Radomski
Email
gmina@starablotnica.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 116938003
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.