1. The Subject Of The Order Is The Reconstruction Of The Playground At Primary School No. 3, Ul. W. Wilsona 34/36 In Zielonka As Part Of The Task Entitled Construction Of An Ecological Playground At Primary School No. 3 Supporting Ecological Education Of The Residents Of The City Of Zielonka. The Project Includes The Construction Of A Safe Sand Surface And The Installation Of Playground Equipment And Other Elements Of Small Architecture. The Order Includes The Following Construction Works: - Disassembly And Demolition, - Construction Of A Safe Sand Surface - 285.60 M2, - Construction Of Sidewalks - 31.20 M2, - Installation Of Permanent Playground Equipment And Other Elements Of Small Architecture, Recultivation Of Existing Greenery. Scope Of Works: 1) Preparatory Works; 2) Demolition And Dismantling Works; 3) Safe Playground Surface; 4) Sidewalk; 5) Play Equipment And Other Elements Of Small Architecture; 6) Tree Care Treatments; 7) Lawn Reclamation; 8) Educational Board On A Frame With A Gable Roof, 1 Set: The Topic Of The Board Is Related To Waste Segregation. Dimensions Min. 200X30x130 Cm, Board Made Of Impregnated Coniferous Wood, Posts With A Diameter Of Min. 10 Cm, Board With Large-Format Print Protected With Uv Varnish, Dimensions Min. 100X70 Cm – Print Pattern To Be Agreed With The Ordering Party; 9) Set Of 10 Ecological Boards - 1 Set: Topics Related To Air, Air, Water And Soil Pollution, Saving Water, Caring For The Environment, Recycling, Waste Segregation, Waste Decomposition, Etc. - Templates To Be Agreed With The Ordering Party, Boards With Dimensions Of Min. 130X100 Cm Made Of Dibond With A Thickness Of Min. 3 Mm, Protected With Uv Varnish, To Be Mounted On A Playground Fence (Mesh And Fence); 10) Post-Construction Inspection Of The Playground: After Completion Of Construction Works, The Contractor Is Obliged To Commission An Inspection Of The Playground By A Certified Company At His Own Expense, Along With Presenting A Report And An Inspection Certificate With A Result Of Min. Good. Carrying Out A Post-Construction Inspection Of The Playground Carried Out By An Inspection Body That Meets The Requirements Of The Pn-En Iso/Iec 17020:2012 Conformity Assessment Standard; 11) The Contractor Will Be Obliged To Provide The Ordering Party With Certificates Of Compliance With The Pn-En 1176:2017-12 And Pn-En 1176:2014-11 Standards Or Equivalent Playground Equipment Before Their Installation; 12) Cleaning Works; 13) Geodetic Marking Out. Note: In The Offer Form, Contractors Are Obliged To Provide The Name Of The Manufacturer Of The Offered Playground Equipment And Other Elements Of Small Architecture Indicated In Point. 7.4. Description Of The Subject Of The Order (Annex No. 8 To The Swz). A Detailed Description Of The Subject Of The Order, Scope And Implementation Conditions Is Included In The Design Documentation Prepared By Woźnicki Zdanowicz Architekci (Annex No. 8 To Swz): - Executive Design For The Reconstruction Of The Playground At
Contact Information
Address
Miasto Zielonka,Zielonka,05-220,Mazowieckie,Pl912 - Warszawski Wschodni
Email
zam.publiczne@zielonka.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 116935332
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.