|
1. The Subject Of This Procedure Is The Implementation Of The Investment Entitled: Construction Of A Parking Lot At The Stadium From The Side Of Starzyńskiego Street In Łowicz - Stage I.2. The Scope Of The Planned Investment Includes The Construction Of A Parking Lot For 57 Passenger Cars, Including Three For Disabled People (Stage I According To The Graphic Attachment To The Swz).3. The Scope Of The Investment Includes The Construction Of A Parking Lot, Two Entrances, Construction Of Area Lighting, Reconstruction Of Road Lighting, Demolition (Of The Concrete Fence And The Ticket Office Building), Construction Of A New Fence, Felling Of Trees, Replacement Plantings In Accordance With The Design Documentation Constituting An Annex To The Swz, And In Particular The Scope Includes: 1) For Paved Areas: • Demolition Works (Elements Of Existing Surfaces, Topsoil, Cutting Down Of Trees And High Greenery, Elements Of Fencing On The Side Southern And Partially Western According To Pzt And Demolition Of The Ticket Office On Plot No. 4304/1), • Earthworks, • Installation Of Curbs And Concrete Edges, • Construction Of Slopes And Drainage Inlets For The Installation Infrastructure, • Construction Of The Base And Internal Surface From A Demountable Surface - Concrete Cubes, • Construction Of The Base And Driving Surface With A Grass Surface Reinforced With A Grid For Geogrids With A Minimum Value For The Surface Biologically Active 88%, • Construction Of Strips Separating Parking Spaces And Markings In The Technology Of A Grass Surface Reinforced With A Grid, • Construction Of Strips Separating Parking Spaces And Markings In The Technology Of Pavement Hardened With Concrete Cubes, • Development Of Greenery, Including The Implementation Of Replacement Plantings In The Scope Of The Study. Note: The Ordering Party Maintains The Provisions Contained In The Answer To The Contractors Question From The Previous, Canceled Tender For The Implementation Of The Investment In Question (Letter Dated 30/07/2026, Procedure No. Wiips.271.2.11.2026), I.E.: If The Bearing Capacity Of The Subsoil Is Achieved (On An Ordinate Other Than That Provided For By The Pt), Confirmed By The Value Of The Secondary Deformation Modulus E2, Meeting The Pt Requirements, It Will Be Possible To Reduce The Thickness Of The Frost-Resistant Layer. The Measurement Results Should Be Presented.2) For Exit No. 1: • Demolition Works (Elements Of The Existing Surfaces Including Pavement, Topsoil), • Cutting Down Trees And Grubbing Up; • Earthworks, • Installation Of Curbs And Concrete Edges With Footings, • Construction Of An Exit Structure With A Concrete Block Surface, • Tidying Up The Area Around The Investment. 3) For Exit No. 2: • Demolition Works (Elements Of Existing Surfaces, Topsoil), • Earthworks, • Installation Of Curbs And Concrete Edges With Footings, • Construction Of An Exit Structure With A Concrete Block Surface And Corrections Of The Existing One Road, • Tidying Up The Area Around The I
|