|
Engineering Design Services For The Construction Of Civil Engineering Works - Update Of Documentation For Stage 2 Of The Construction Of The Regional Racibórz-Pszczyna Road On The Section From Ul. Pstrązka In Rzuchów (Dw 923) To Ul. Raciborska In Rydułtowy (Dw 935). 1. The Subject Of The Order Is An Update Of The Construction, Surveying And Environmental Design Documentation For Stage 2 Of The Racibórz - Pszczyna Regional Road, I.E. On The Section From The Junction At Ul. Pstrązka In Rzuchów (Including The Entire Junction) To Ul. Raciborska In Rydułtowy. Road Class: Gp Cross-Section: 2/2 Length Of The Section Covered By The Update Approx.: 5.64 Km Scope Of Updating The Design Documentation: The Update Will Include, Among Others: 1) Preparation Of A Map For Design Purposes, 2) Conducting Industry Interviews, 3) Obtaining Excerpts From The Land Register, 4) Updating The Land Development Design, 5) Updating The Architectural And Construction Design In The Field Of The Road Industry And Engineering Facilities As Well As The Greenery Development Design, 6) Updating The Designs Of Sanitary Networks And Electrical And Telecommunications Networks, 7) Performing A Road Safety Audit, 8) Preparing An Application For Issuing A Zrid Decision, 9) Preparing A Cadastral Map With Demarcation Lines, 10) Preparing A Map With The Route Of The Road, Marking The Area For Construction Facilities And The Existing Infrastructure, 11) Performing An Analysis Of The Roads Connections With Other Public Roads, 12) Determining Changes In The Existing Land Development Infrastructure, 13) Obtaining An Opinion Required By The Special Road Act, 14) Updating The Real Estate Division Projects, 15) Updating The Traffic Forecast For The Entire Unbuilt Course Of The Regional Road Racibórz - Pszczyna, 16) Preparing A Nature Inventory, 17) Preparing Another Environmental Impact Report, 18) Preparing An Executive Design, 19) Preparing A Design For Changing The Traffic Organization For The Duration Of The Construction Of The Tor And A Design For The Target Traffic Organization Of The Dor, 20) Preparing A Bill Of Quantities For The Technological System For Each Industry And In The Specification System (Ter), Preparation Of Technical Specifications And Acceptance Of Construction Works, Preparation Of An Investors Cost Estimate For All Industries - Detailed And Simplified Arrangement And In The Form Of Ter, 21) Preparation Of A Technical Design, 22) Preparation Of Demolition Designs For Conflicting Structures, 23) Obtaining Water Permits. The Update Includes, Among Others: Adaptation Of Documentation To Applicable Technical And Construction Regulations Regarding Public Roads. As Part Of The Task, It May Be Necessary To Update (Or Obtain New) Decisions, Arrangements And Opinions, Including Current Geological And Mining Conditions Or To Supplement The Geotechnical Foundation Conditions. 2. A Detailed Description Of The Subject Of The Contract Is Specified In: - Description Of The Subject Of The Contract - Annex No. 5 To The Swz, - Draft Provisions Of The Contract - Annex No. 4 To The Swz. The Ordering Party Requires That The Offered Service, Including All Ict Products, Ict Services And Ict Processes Used To Complete The Order, Both As Main Elements And Components, Elements Of The Environment, Service Provision Or Accompanying Solutions, Does Not Include: • Ict Products, Services
|