|
Short Dated Tender - Bids Are Invited For General Servicing Of 15 Kva Capacity Of Dea Sets Of Different Makes And Models Under Various Exchanges , General Servicing Of 20 To 25 Kva Capacity Of Dea Sets Of Different Makes And Models Under Various Exchanges , General Servicing Of 30 To 40 Kva Capacity Of Dea Sets Of Different Makes And Models Under Various Exchanges , General Servicing Of 50 To 82.5 Kva Capacity Of Dea Sets Of Different Makes And Models Under Various Exchanges , Providing Maintenance Free New Lead Acid Batteries 12V 100 Ah , Providing Maintenance Free New Lead Acid Batteries 12V 130 Ah , Stop Solinoid 12 Volt Engine Shut Off Solenoid , Mechanical Type Rpm Cum Hour Meter , Rpm Cum Hour Meter Chain , 12 V, 10 Amp. Battery Charger Smps Including Transformer Rectifier Unit And Filter Circuit Etc Complete As Reqd , Oil Pressure Gauge , Oil Temperature Meter , Oil Temperature Safety5 , Water Temperature Meter , Starting Key Switch , 100 Amps Three Pole Mccb 18 Ka , Vaf Meter , 32 Amp 4 Pole Mcb , 63 Amp 4 Pole Mcb , Dc Voltmeter , Dc Ammeter , Auto Or Manual Rotary Switch , Over Speed Safety , Battery Leads Flexible Including Terminals Nuts And Bolts , Coolant , Flexible Wire Braided Fuel Pipe , Benzo Bolts , Engine Start Relay , V-Belt For 15 Kva To 50 Kva Engines , Led Type Indication Lights Including Making Interconnection , Repairing And General Servicing Of The Existing Faulty Radiator In Existing Dea Set Up To 20 Kva , Repairing And General Servicing Of The Existing Faulty Radiator In Existing Dea Set Above 20 Kva And Up To 50 Kva , Repairing And General Servicing Of The Existing Faulty Radiator In Existing Dea Set Above 50 Kva And Up To 82.5 Kva , Servicing Of The Self Starter Of Dea Set , Repairing And Servicing Of 12 Volt Self Self Starter Of Dea Set , Minor Repairing And Servicing Of The Charging Alternator Of The Dea Set , Sitc Of 12 Volt Self Starter Cranking Motor Or Starter Motor Assembly With New One Upto 30 Kva Dea Set , Calibration Of The Fuel Injection Pump Of Up To 2 Cylinder Engine Of Different Makes And Models Under Various Exchanges , Calibration Of The Fuel Injection Pump Of Up To 2 Cylinder Engine Of Different Makes And Models Under Various Exchanges Up To 4 Cylinder Engine , Calibration Of The Fuel Injection Pump Of Up To 6 Cylinder Engine Of Different Makes And Models Under Various Exchanges Up To 6Cylinder Engine , Extra Charges For Delivery Valve Of Fuel Pump If Required Labour Charges For Dismantling And Refixing At Site Already Covered In Above Caliberation Item , Extra Charges For Delivery Valve Element Of Fuel Pump If Required Labour Charges For Dismantling And Refixing At Site Already Covered In Above Caliberation Item , Extra Charges For Delivery Nozzle Of Fuel Pump If Required Labour Charges For Dismantling And Refixing At Site Already Covered In Above Caliberation Item , Repairing Of Cylinder Head If Required To Stop The Leakage After Replacement Of Gaskets And Repositioning Of Head Per Head Etc Complete As Reqd , Repairing Of Stator Winding Of 10Or15Or20 Kva Rating, Singleorthree Phase, 230Volt Or 415 Volt 50Hz 0Point8 Pf Alternator , Repairing Of Rotor Winding Of 10Or15Or20 Kva Rating, Singleorthree Phase, 230Volt Or 415 Volt 50Hz 0Point8 Pf Alternator , Rewinding Of Exciter And Field Winding Of 10Or15Or20 Kva Rating Singleorthree Phase, 230Volt Or 415 Volt 50Hz 0Point8 Pf Alternator , Repairing Of Stator Winding Of 30Or35Or63 Kvarating Singleorthree Phase 230Volt Or 415 Volt 50Hz 0Point8 Pf Alternator , Repairing Of Rotor Winding Of 30Or35Or63 Kvarating Singleorthree Phase 230Volt Or 415 Volt 50Hz 0Point8 Pf Alternator , Rewinding Of Exciter And Field Winding Of 30Or35Or63 Kvarating Singleorthree Phase 230Volt Or 415 Volt 50Hz 0Point8 Pf Alternator , Replacement Of Avr Of Dea Sets Complete With Interconnection Testing Up To 15Kva , Replacement Of Avr Of Dea Sets Complete With Interconnection Testing Above 15 Kva To 30Kva , Replacement Of Avr Of Dea Sets Complete With Interconnection Testing Above 30 Kva To 63 Kva , Repairing Of Existing Canopy Of 15 Kva Dg Set By Providing Suitable Ms Sheet On Damaged Roof Etc As Required , Rewinding Of Existing Exhaust Fan In 15 Kva Dg Silent Enclosure Complete In All Respects Including Dismantling From Site Carriage Rewinding And Refixing At Site Complete Etc As Required , Replacement Of On Load Changeover Switches Of Four Pole 32A With Side Handle With Ss Enclosure , Replacement Of On Load Changeover Switches Of Four Pole 63A With Side Handle With Ss Enclosure , Repairing Of Control Wiring Of Existing Conventional Control Panel Of Dea Set With Replacement Of Damaged Wiring , Replacement Of Faulty Couplings With New One In 10Or15 Kva Dea Set , Replacement Of Faulty Couplings With New One In 20Or30Or32.5 Kva , Dismantling The Fuel Tank From Canopy And Cleaning The Tank , Dismantling The Fuel Tank From Canopy And Transporting The Same Up To Nearest Welding Workshop
|