1. Subject Of The Order: Scope: The Water Supply Network Is To Be Made Of Pipes, Ø110, Ø90, 63, 40 Mm. A Technical And Technological Solution Has Been Designed To Minimize The Risk Of Emergency Situations. The Foundation Of The Water Pipeline Should Meet The Conditions Applicable To Pipelines Made Of Pe. Pe 100Rc Pipes Should Be Used In Accordance With The Pas 1075 Standard, Which Do Not Require The Use Of Sand Bedding And Are Laid In The Ground Using Traditional And Narrow Trench Methods. Pipelines Should Be Laid In Accordance With Longitudinal Profiles, At The Minimum Depth Specified In The Standards. The Route Of The Underground Water Supply Network Should Be Marked With A Pvc Foil Tape With A Metallic Insert At A Depth Of 70 Cm Below The Ground. The Constructed Water Supply Network Will Be Equipped With Mains And Junction Gate Valves, As Well As Above-Ground Fire Hydrants With Shut-Off Valves. Regulation And Measurement Chambers Should Be Constructed In The Water Supply Network. The Scope Of Work Includes The Construction Of A Water Supply Network And The Protection Of Existing Underground Utilities Intersecting With The Planned Network. The Detailed Scope Of Work Is Presented In The Design Documentation, Subsoil Documentation, Technical Specifications And Bill Of Quantities. Please Note That The Valuation Should Include The Section Of The Water Distribution Network From Point Ha 29 To Ha 66 Along With Profile A Branches. The Water Supply Network Should Be Constructed In Accordance With The Attached Construction Design, The Technical Specification For The Execution And Acceptance Of Construction Works And The Arrangements With The Supervision Inspector And The Employer.2. The Contractor Is Obliged To Include In The Offer Price All Works, Materials, Devices, Equipment And Other Activities Necessary For The Correct And Complete Execution Of The Scope Of Works In Question, In Accordance With The Design Documentation And The Employers Requirements. The Subject Of The Order Should Be Performed In Accordance With The Design Documentation - Annex No. 7 To The Swz: (In Connection With The Lump-Sum Settlement, The Submitted Bills Of Quantities Are Only Of Auxiliary Nature And Do Not Constitute The Basis For The Offer Valuation). - Principles Of Technical Knowledge, Currently Applicable Law Construction Together With Implementing Acts And Occupational Health And Safety Regulations.
Contact Information
Address
Gmina Rymanów,Rymanów,38-480,Podkarpackie,Pl821 - Krośnieński
Email
przetargi@rymanow.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 116891809
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.