As Part Of The Order, The Contractor Is Obliged To Comprehensively Carry Out The Task Of Thermal Modernization And Modernization Of The Roof In The Building Located At Godlewo-Gudosze 17, 07-324 Szulborze Wielkie.2. Scope Of Work: A. Securing The Work Site; B. Carrying Out Preparatory And Demolition Works Necessary For The Implementation Of The Investment;• Dismantling Gutters, Downpipes, Flashings, Eaves, Collars And Cornices;• Removing External Plasters;• Dismantling Stoves And Kitchen Cores Faced With Tiles;• Removing Rubble And Soil From The Building;• Removing Rubble From The Demolition Area.C. Insulation Of The External Walls Of The Building Along With The Implementation Of A Complete Facade Plaster;• Polystyrene System (Eps) - Mineral Decorative Set - 12 Cm Thick Boards;• Mechanical Fastening (Pinning) Of The Wall Thermal Insulation;• Installation Of Window Expansion Joint Profiles, Corner Protective Profiles, Facade Profiles; D. Insulation Of Jambs With Polycarbonate Roofs. Insulation Of The Attic Ceiling And Roof Covering;• Thermal And Sound Insulation Made Of 25Cm Mineral Wool,• Collar-Shaped Roof Truss,• Boarding Of The Roof Slopes,• Battening;• Use Of Pre-Covering Foil;• Installation Of Counter Battens On The Roof Without Formwork;• Roof Covering,• Execution Of Sheet Metal Work And Gutters. The Detailed Scope Of The Task In Connection With The Roof Covering Is Included In Annex No. 6 To Swz.F. Installation Of Eaves Finishing Elements; G. Purchase, Delivery And Installation Of Electric Heaters With A Power Of 4.5 Kw. Intended For Heating Residential Premises, Along With The Necessary Installation Accessories, Making The Required Electrical Connections, Commissioning And Checking The Correct Operation. The Delivered Radiators Must Be:• Brand New, Unused, Free From Physical And Legal Defects;• Have The Ce Marking And A Declaration Of Compliance With Applicable Regulations And Standards;• Equipped With An Electronic Thermostat Enabling Temperature Regulation;• Equipped With Overheating Protection And An Anti-Freeze Protection Function;• Adapted To Be Powered By The Electrical Installation In Accordance With The Design Documentation;• Made Of Materials Ensuring Durability, Safety Of Use And Corrosion Resistance.H. Insulation Of Foundation Walls; • Polystyrene (Eps) System - Decorative Dispersion Set Of Boards With A Thickness Of Min. 12 Cm.• Anti-Moisture Insulation. Performance Of All Finishing, Cleaning And Reconstruction Works Resulting From The Technology Of Work Execution.
Contact Information
Address
Gmina Szulborze Wielkie,Szulborze Wielkie,07-324,Mazowieckie,Pl924 - Ostrołęcki
Email
gmina@ugszulborze.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 116891787
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.