1. The Subject Of The Order Is The Development Of Comprehensive Design Documentation, Obtaining A Notification And Performing Construction And Assembly Works In The Scope Of The Modernization Of The Orlik Complex And The Assembly Of Small Architecture Objects On The Premises Of The Public Primary School In Gorzów Śląski. The Study Also Includes The Implementation Of Electrical Installations To The Extent Necessary For The Functioning Of The Monitoring System. The Subject Of The Order Includes Obtaining The Necessary Decisions, Opinions And Arrangements, As Well As Supervising And Providing Management Of The Works In All Industries. The Investment Will Be Located Entirely On The Plot. Registration No. 764/1, 764/2 In Gorzów Śląski, Owned By The Commune. As Part Of The Investment Task, Documentation Should Be Developed Along With The Necessary Arrangements And Permits, As Well As The Performance Of Construction Works, The Aim Of Which Is: A) Modernization Of The Orlik Sports Fields Complex - Replacement Of Ball Catch Nets - Replacement Of Football Goals With Nets - Replacement Of Basketball Nets - Replacement Of Waste Bins - Replacement Of Led Fixtures - Replacement Small Architectural Objects (Benches, Waste Bins) - Modernization Of The Synthetic Grass Surface (Glued In One Place) - Installation Of Monitoring - Installation Of A Notice Boardb) Modernization Of The Beach Volleyball Court - Installation Of Nets And Poles) Installation Of Small Architectural Elements - A Fitness Playground With A Synthetic Grass Surface And Elements Of Small Architecture (Bench, Waste Bin) D) Carrying Out Auxiliary, Preparatory And Cleaning Works And Repair Of Any Damage) Carrying Out Necessary Measurements, Tests And Checksf) Providing, If Necessary, A Construction Manager And Designer Supervision By Persons With Appropriate Construction Qualifications) Providing Geodetic And Geological Construction Services H) Maintaining Construction Documentationi) Conducting Appropriate Tests And Examinations, Developing As-Built Documentation Of Post-Construction Geodetic Measurements) Preparing As-Built Documentation Of The Investment 1.1. In The Design Documentation, The Contractor Is Obliged To Agree On The Draft Documentation Being Developed And To Take Into Account The Employers Comments, Guidelines And Instructions. The Ordering Party Requires The Contractor To Organize Coordination Meetings With The Participation Of The Ordering Party And The Contractors Representatives In Order To Discuss Current Matters Regarding The Progress Of The Design Documentation, Proposed Design Solutions Or Problems Occurring At The Design Stage. Coordination Meetings Should Be Held At Least Once A Month. The Dates Of The Coordination Meetings Will Be Set By The Ordering Party In Consultation With The Contractor.1.2. Before Submitting A Notification To The Architectural And Construction Department, The Contractor Is Obliged To Obtain The Employers Written Acceptance Of The Adopted Design Solut
Contact Information
Address
Gmina Gorzów Śląski,Gorzów Śląski,46-310,Opolskie,Pl524 - Opolski
Contact No.
343505710
Email
um@gorzowslaski.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 116891767
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.