1. The Subject Of The Order Is The Construction Of Production Well No. 4 In The Area Of The Groundwater Intake And The Construction Of A Retention Tank At The Water Treatment Plant In Gucin. The Subject Of The Order Is Hereinafter Referred To As The Object Or Subject Of The Order.2. The Scope Of Work Includes, Among Others: Drilling A Production Well With Test Pumping, Developing As-Built Documentation For The Water Intake Along With A Summary Of The Results Of Drilling The Hole, Developing Documentation Including: Selection Of The Above-Ground Part Of A Deep Well With Accessories, Selection Of A Deep Well Pump, Selection Of A Discharge Pipe From The Pump (Aisi 304 Steel) For Connection To The Process Pipeline. The Documentation Should Be Agreed With The Investor, - Execution Of The Intake Infrastructure Based On The Prepared Design Documentation, - Construction Of A Retention Reservoir (Works On The Construction Of The Retention Reservoir Will Be Able To Start After The Ordering Party Obtains A Construction Permit), - Preparation Of As-Built Surveying Documentation. 3. A Detailed Description Of The Subject Of The Order In This Procedure Is Included In The Design Documentation, Technical Specifications For The Execution And Acceptance Of Construction Works (Stwiorb), Bills Of Quantities, Swz, Contract Template And Annexes. 4. The Contractor Will Perform The Subject Of The Order On The Basis Of Design Documentation, Technical Specifications For The Execution And Acceptance Of Construction Works (Stwiorb), Tender Specifications Together With Annexes, Questions And Answers Provided During The Public Procurement Procedure And Bills Of Quantities, As Well As Applicable Detailed Regulations And Construction Practice Together With The Warranty And Warranty Period. The Basis For Preparing The Offer Is The Design Documentation, Stwiorb And Answers To Inquiries During The Public Procurement Procedure. Bills Of Quantities Are Only Supporting Material. All Requirements Specified In The Documents Indicated Above Are Minimum Requirements And Their Fulfillment Is Obligatory. Failure To Meet The Above-Mentioned Minimum Requirements Will Result In Rejection Of The Offer As Inconsistent With The Terms Of The Contract Pursuant To Art. 226 Section 1 Point 5 Of The Public Procurement Law. 5. The Contractor Will Provide No Less Than 36 Months Of Warranty And Warranty For Defects For The Completed Construction Work From The Date Of Acceptance Of The Final Subject Of The Order. The Contractor Proposes The Warranty And Warranty Period In The Tender Form Constituting Annex No. 1 To The Swz, In Accordance With The Arrangements In Chapter Xvi Of The Swz (Description Of The Offer Evaluation Criteria).6. The Execution Of The Order Is Subject To Polish Law, In Particular The Act Of July 7, 1994 Construction Law.7. The Ordering Party Requests That The Contractor Indicate The Parts Of The Order Whose Performance He Intends To Entrust To Subcontractors And That The Contracto
Contact Information
Address
Gmina Łukta,Łukta,14-105,Warmińsko-Mazurskie,Pl621 - Elbląski
Contact No.
896475070
Email
palmowska@lukta.com.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 116891764
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.