1) The Subject Of The Order Is: Reconstruction Of Forest Roads No. 108 And 110 (Fire Access Road No. 69), Both In The Biała Wielka Forest District. The Order Includes The Following Works: A) Reconstruction Of Forest Road No. 108 In The Biała Wielka Forest District With A Total Length Of 1,558 Meters, With The Scope Of Preparatory Works, Earthworks, Drainage, Substructure, Surface And Works. Finishingthe Reconstruction Of The Road Is Planned In 4 Sections Divided By Foreign Lands Which Are Excluded From The Study: Section A-B 66.9 M Long, Section C-D 460.3 M Long, Section E-F 302.4 M Long, Section G-H 728.5 M Long, Total Length 1558.1 M. The Following Road Structure Was Designed:• Aggregate Base 0-63 Gr. 20 Cm After Compaction• Aggregate Surface 0-31.5 Gr. 10 Cm After Compacting With Fine Aggregate 0-4 Or 0-8; With The Following Parameters: • Road Width 3.50 M - Roof Cross-Slope 3% • Roadside Width 0.75 M - 6% Cross-Slope • Road Crest Width 5.50 M. The Following Are Designed On The Road Route: Passing Areas, Horizontal Curves (Widenings), Maneuvering Area, Culvert B) Reconstruction Of Forest Road No. 110 - Fire Access Road No. 69 In The Biała Wielka Forest District With A Total Length Of 572 M, With The Scope Of:• Preparatory Works• Earthworks• Substructure• Surface• Finishing Worksthe Reconstruction Of The Road Is Planned On Section A-B 511 M Long, Section C-D 45 M Long, Section E-F 16 M Long, Total Length 572 M M. The Following Road Structure Was Designed:• Subbase Of 0-63 Gr. 20 Cm Aggregate After Compaction• Roof Slope Of 0-31.5 Gr. 10 Cm After Compaction With Fine Aggregate 0-4 Or 0-8; With The Following Parameters:• Road Width 3.50 M - Cross Slope 3%• Roadside Width 0.75 M - Transverse Slope 6%• Width Of The Road Crown 5.50 M The Road Route Includes: Passing Areas, Curved Exits, Evaporators. All Road Construction Works Related To The Reconstruction Of The Above-Mentioned Roads Are Located In The Area Owned By The State Treasury, I.E. On Plots Managed By The State Forests Of The Koniecpol Forest District. The Designed Road Route Does Not Violate The Legal Status Of Third Parties.2) General Information Regarding The Implementation Order: A) The Price Of The Offer Should Include: - In The Case Of Using Subcontractors, Coordinating The Works Of Subcontractors, Bearing Full Responsibility For Them; - Carrying Out The Work Taking Into Account All Conditions And Orders Arising From The Arrangements And Mutual Obligations; - Ensuring The Proper Condition And Order Of The Work Site, As Well As In The Case Of Using Roads, Real Estate, Facilities, Devices That The Contractor Will Disturb In Order To Perform The Subject Of The Order, - Compensation For Any Damage Related To The Performance Of The Works Caused To Third Parties Or Damage To Property; - Costs Of All Utilities Necessary To Complete The Order (Electricity, Water, Etc.) - Waste Management In Accordance With The Provisions In The Bills Of Quantities And Descriptions In The Project; B) Conditio
Contact Information
Address
Państwowe Gospodarstwo Leśne Lasy Państwowe Nadleśnictwo Koniecpol,Koniecpol,42-230,Śląskie,Pl224 - Częstochowski
Email
koniecpol@katowice.lasy.gov.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 116891725
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.