|
4.1. The Subject Of The Order Are Construction Works Consisting Of Thermal Modernization, Expansion And Reconstruction Of The Administrative Building Along With Land Development As Part Of The Investment Project Titled: Energy Modernization Of Public Buildings In The Zamość Mof.1) Place Of Investment Implementation: Ul. Szczebrzeska 120, 22-400 Zamość, Plot No. 17/17, Registration Unit: 066401_1 City Of Zamość4.2. The Scope Of The Order Includes: Comprehensive Thermal Modernization, Expansion And Reconstruction Of The Administrative Building At Ul. Szczebrzeska 120 In Zamość In The Scope Of Works In The Field Of Construction And Construction, In The Field Of Installation In The Field Of Heating, Ventilation, Gas, Water And Sewage Networks, Installations And Devices, And In The Field Of Installation In The Field Of Electrical And Power Installations And Devices, In The Field Of Installation In The Field Of Telecommunications Networks, Installations And Devices Aimed At Improving The Energy Efficiency Of The Building In Question.1) The Scope Of Works Includes In Particular: Replacement Of External And Internal Windows And Doors, Insulation Of External Partitions, Replacement Of The Roof Covering Along With Insulation Of The Flat Roof, Replacement Of Sheet Metal Flashings, Replacement Of Gutters And Downpipes, Replacement Of The Central Heating Installation, Lightning Protection System, Electrical Installation, Alarm System, Basic, Emergency And Evacuation Lighting Installation, Installation Of Grounding Building, Reconstruction Of The Water Supply And Sewage System, Construction Of A Photovoltaic Installation, Installation Of Heat Pumps, Expansion Of The Building With A Staircase With An Elevator For Disabled People Along With An Entrance Area On The South Side, Reconstruction Of Part Of The Existing Staircase Into Toilets With Accessibility For Disabled People And Additional Rooms, Reconstruction Of The Gas Connection With The Installation Gas, Reconstruction Of The Cable And Measurement Connection, Reconstruction Of The Telecommunication Sewage System, Construction Of Small Architectural Elements, Execution Of External Lighting, Execution Of External And Internal Monitoring, Reconstruction Of The Parking Lot, Including Parking Spaces For Disabled People, Hardening Of The Area, Sidewalks And Accesses And Renovation Of Existing Surfaces, Finishing Works Inside The Building, Other Construction Works In The Industry General Construction, Sanitary And Electrical Works.2) The Contractor Is Fully Liable For Damage Resulting From Improper Protection Of The Building During The Works, In Particular For Flooding, Moisture, Damage To Equipment And Building Elements Remaining Outside The Scope Of The Works.3) The Contractor Is Not Authorized To Move Or Use The Ordering Partys Equipment Without Its Written Consent, Except For Cases Agreed With The Ordering Party And Necessary To Carry Out The Works.4) The Subject Of The Contract Must Be Pe
|