|
1. The Subject Of The Order Entitled Construction Of A Skate Park With Accompanying Infrastructure At The Primary School In Księżpol Is The Construction Of A Skate Park With Accompanying Infrastructure On The Premises Of The Primary School. Jana Pawła Ii In Księżpol, Plot No. 207/15. The Investment Includes The Delivery And Assembly Of Devices And Equipment For The Skate Park And Complementary Elements, As Well As The Construction Of Hardened, Communication And Auxiliary Surfaces, Including The Running Board Of The Skate Park Made Of Poured Concrete, And Tidying Up The Area With Sowing Grass And Planting Trees.1) The Scope Of The Investment Includes In Particular: A) Construction Of The Skate Park - Delivery And Installation Of Equipment; Construction Of The Driving Surface From A Poured Concrete Slab. • Skate Park Driving Slab: Mechanically Troweled Poured Concrete With A Thickness Of 15 Cm Area 656.20 M2 As Described In The Document. Design. Designed Layer System, Including The Substructure: 15 Cm - Concrete Surface, Reinforced As Described In The Design Documentation, 0.15 Mm - Slip Layer Made Of Pe Foil, 2 Layers, 12 Cm - Lean Concrete Rm = 9 Mpa According To Pn-S-96013:1997, 30 Cm - Frost-Protective Layer Made Of Aggregate. 0/2 F/6 Pn-En 13242+A1:2010 Secondary Deformation Modulus E2 ≥ 50 Mpa - G1 Soil Base Or Supplementary Embankment Made Of Non-Expanded Aggregate To Maintain The Frost Resistance Condition Of 60 Cm. • Skate Park Equipment In A Reinforced Concrete Structure, Prefabricated By A Manufacturer With A Certificate Issued In Accordance With The Pn-En Standard 14974:2019-07. A Tolerance Of Device Dimensions Of +/- 5% Is Allowed, While Maintaining The Applicable Safety Zones. - Beginners Section - Figures Small Bank/Low Bank [1], Dim. 330X366x60, Box + Manual Pad [2], Dimensions 600X181x20/45, Flatrail [3], Dimensions 400X25, Small Qarterpipe/Quarter Low [4], Dimensions 280X366x60, Open Square Without Driving Training Equipment [8], Dimensions Approx. 1100X900,- Intermediate Section - Figures Large Bank Connected To Quarterpipe/High Bank + High Quarter [5], Dimensions. 416X610x150,, Extended Funbox With Handrails, Pyramid And Box/ Funbox + Pyramid + Wall 3/3 + Platform + Break +2X Handrail [6], Dimensions. 720X972x40/60, Large Quarterpipe [7], Dimensions 320X610x150,B) Installation Of Additional Equipment, I.E. • Board With Regulations/Instructions For Use Of The Skate Park [T] • Arched Benches [Ł1] • Straight Benches [Ł2] • Waste Bins [K] • Bicycle Racks [St] U With Dimensions Above The Ground 100X80cm.C) Installation Of A Water Fountain With Construction Of A Section Of Internal Water Supply System In The Ground Spring. Spa With 3 Bowls Mounted At Different Heights. D) Construction Of Hardened, Communication And Auxiliary Surfaces. • A 2 M Wide Sidewalk Connecting The Designed Skate Park With Gates In The Fence Of The Area And With The Existing Access/Passage Around The School Building And Widening For Bicyc
|