|
Reconstruction Of The Street Lawendy In Tomaszewo Includes: 1) Inclusion In The Road No. 639025P From Km 0+000 To Km 0+009, Including: Measurement Works, Milling Of Bituminous Surface On A Section Of 90,000 M2, Dismantling Of 20X30 Concrete Curbs Over A Length Of 20 M, Dismantling Of The Edges Of The Footing For The Curbs, Concrete Curbs 15X30 Cm – 19,000 M, Sprinkling With Asphalt Emulsion – 90,000 M2, Including Surfaces Made Of Mineral-Asphalt Mixtures – 90,000 M2, Sidewalks: Curb Benches 30X40 Cm – 16,000 M, Edge Bench With Resistance, Surfaces Made Of Red Phase-Free Concrete Paving Stones Thick 8 Cm 42,000 M2, Roadside Profiling With Markings; 2) Road With A Road With A Bituminous Surface Km From 0+009 To Km 0+646, Including: Cutting Down 24 Trees, Earthworks, Road: Stabilized Soil Base - 3,366,000 M2, Crushed Aggregate Base, Spraying With Emulsion Asphalt Road In Ill. 0.5 Kg/M2 – 3,366,000 M2, Surface Binding Layer – 3,442,440 M2, Surface Wearing Course – 3,366,000 M2, Construction Of Asphalt Exits – 372,640 M2, Roadsides Surface Made Of Crushed Aggregate – 802,500 M2, Drainage Including Culverts, Sewers, Pipe Culverts Under The Road; 3) Roadway With A Crushed Stone Surface From Km 0+646 To Km 0+730, Including: Cutting Down 3 Trees, Earthworks, Roadway: Foundation Made Of Stabilized Soil - 477,200 M2, Roadway: Foundation Made Of Cement-Stabilized Soil, Foundation Layer Made Of Crushed Aggregates - 477,200 M2, Exits: Base Layer Made Of Crushed Aggregates - 72,050 M2, Roadsides Made Of Crushed Aggregate - 109,875 M2, Drainage Including Pipe Culverts Under The Exits - 1,600 M3, Culverts Under The Road - 16,000 M, Cleaning Of Ditches - 60,000 M, Finishing Works.
|