1. The Subject Of The Investment Is The Renovation Of The Operational And Technical Part By Modernizing The Floor In The Combat Part Of The Unit, Modernizing The Central Heating Installation And Painting The Roof Of The Volunteer Fire Department Station In Łapsze Niżne. I. Scope Of Renovation Works At The Volunteer Fire Department Station - Painting The Roof1. Renovation Works Of Damaged Chimney Caps And Renovation Of Chimneys.2. Complementing Chimney Flashings.3. Replacing Drain Pipe Cleaners.4. Repair Of Semi-Circular Gutters (Replacement, Soldering).5. Replacing Gutter Hooks.6. Repair Of Downspouts.7. Painting Metal Elements (Gutters And Downspouts).8. Cleaning The Roof Surface.9. Degreasing The Roof Surface.10. Painting Primer Paint.11. Painting With Polyvinyl Enamel.12. Installation Of Ventilation Grilles.13. Installation Of Snow Barriers.14. Cleaning And Washing Wooden Soffits.15. Impregnation Of Wooden Soffit Surfaces.16. Carrying Out Tests And Measurements Of The Grounding And Lightning Protection Installations And The Effectiveness Of Zeroing - Lightning Insulation. Ii. Scope Of Renovation Works Of The Combat Part Of The Volunteer Fire Department Station - Floor: 1. Complementing Structural Elements Made Of Monolithic Concrete.2. Repair Of Existing Subfloor.3. Preparation Of The Substrate For Floor Coverings.4. Filling The Floor Drains.5. Delivery And Installation Of A Floor Made Of Pvc/Pvc Tiles, 10 Mm Thick.6. Applying A Protective Pu Coating To The Floor.7. Sealing The Floor At The Junction With The Paving Stone Surface In The Entrance Gates. Iii. Scope Of Renovation Works Of The Combat Part Of The Volunteer Fire Department Station - Modernization Of The Central Heating Installation: 1. Dismantling The Steel Pipeline.2. Disassembly Of Radiators Made Of Steel And Finned Pipes.3. Construction Of A Carbon Steel Pipeline In Central Heating Installations. And C.T.4. Insulation Of Pipelines5. Making Connections To Radiators6. Delivery And Installation Of Automatic Vent Valves7. Delivery And Installation Of Steel Radiators With Valves8. Installation Of New Supply And Return Sections To The Existing Central Heating Installation.9. Performing Tightness Tests Of The Central Heating Installation. Iv. Other Provisions Regarding The Subject Of The Order: A) The Contractor Will Be Obliged, Under This Order, On Its Own And At Its Own Expense: • To Obtain All Arrangements Related To The Execution Of The Order, • During The Implementation Of The Works, Enable And Secure The Passage Around The Fire Station Building And Enable The Functioning Of The Fire Station Building During The Works • Dismantle Temporary Structures, Tidy Up The Construction Site And Used Areas And Restore Them To Their Original Condition, B) The Contractor Is Obliged To Perform All Works Necessary To Complete The Subject Of The Order And Not Specified In The Documents, And The Quoted Price Includes Also The Value Of These Works.C) Remuneration Is Not Due For Works Not Performed As
Contact Information
Address
Gmina Łapsze Niżne,Łapsze Niżne,34-442,Małopolskie,Pl219 - Nowotarski
Contact No.
182659310
Email
gmina@lapszenizne.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 116891591
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.