Quotation are invited for Complete Overhauling of Booster Pump for Habab PH1 a Pumping Station Complete Overhauling and Recoating of Habab PH 1 a Stream Aversa Pump 1032603594 1 ITEM-00001 COMPLETE OVERHAULING OF BOOSTER PUMP FOR HABAB PH1 A PUMPING STATION.PUMP DETAILS: AVERSA PUMP MODEL: DVL-350X300, HEAD-140M, FLOW-2 63L/S,RPM-1475, 630KW.SCOPE OF WORKTHE FOLLOWING OUTLINES THE MANDATORY AND OPTIONAL SCOPE OF WORK FOR THEOVERHAUL OF BOOSTER PUMPS AND THEIR ACCESSORIES AT THE BOOSTER PUMPINGSTATION.1.0 MANDATORY SCOPE OF WORK:A) THE CONTRACTOR IS RESPONSIBLE FOR TRANSPORTING TH E PUMP ASSEMBLY TOAND FROM THE DEWA SITE TO THEIR WORKSHOP. DEWA WILL NOT PROVIDETRANSPORTATION. FOR LOADING AND UNLOADING, THE CONT RACTOR MAY USE DEWA#SOVERHEAD CRANE AT THE PUMPING STATION, WITH PROPER COORDINATION WITHDEWA REPRESENTATIVES. B) REPLACEMENT OF THE MECHANICAL SEAL, COUPLINGBUSH RENEWAL, GLAND PACKING RENEWAL, AND BEARING REPLACEMENT ASREQUIRED. C) OVERHAULING OF 1 SET THE PUMP (REFER TO ANNEXURE I FOR MANDATORYAND ANNEXURE II FOR OPTIONAL WORK). D) EXTERNAL PAINTING OF THE PUMP. E)RECTIFICATION OF ANY ISSUES THAT ARISE AFTER INSTALLATION/LOAD TESTING.THIS SHALL BE DONE ON SITE IF POSSIBLE, AND IF NOT, THE CONTRACTOR ISRESPONSIBLE IN COLLECTIN G THE PUMP AND MOVED IT BACK TO THEIR FACILITY.F) IF ANY PART IS FOUND DEFECTIVE, THE CONTRACTOR IS RESPONSIBLE FORREPAIRING OR REPL ACING IT. DEWA WILL PROVIDE AVAILABLE SPARES. IF ANYSPARE PARTS ARE UNAVAILABLE, THE CONTRACTOR MUST ARRANGE THEM AND SUBMITTHE COST FOR DEWA APPROVAL BEFORE PLACING AN ORDER. G) ONCE THE PUMP ISFULLY ASSEMBLED, THE PUMP MUST BE PRESSURE HYDRO TESTED IN THECONTRAC TOR FACILITY TO MAKE SURE THE PUMP IS WELL ASSEMBLED AND THATTHERE ARE NO LEAKS.2.0 REQUIREMENTS PRIOR TO QUOTATION SUBMISSION:A) TH E CONTRACTOR MUST VISIT THE SITE TO FAMILIARIZE THEMSELVES WITH THESCOPE OF WORK AND POTENTIAL COMPLEXITIES BEFORE SUBMITTING A QUOT ATION.B) DEWA WILL NOT ACCEPT ANY CLAIMS FOR ADDITIONAL CHARGES BEYOND THEAGREED RATES OR PRICES DURING OR AFTER THE EXECUTION OF TH E WORK. C) THECONTRACTOR WILL BE PROVIDED WITH AN EQUIPMENT SHUTDOWN SCHEDULE INCOORDINATION WITH THE OPERATIONS & MAINTENANCE DEPAR TMENT OF THE WATERDIVISION. D) A TIME SCHEDULE OR BAR CHART SHOWING EACH ACTIVITY MUST BESUBMITTED. E) UPON COMPLETION, AN INSPECTIO N CHECKLIST AND QUALITYPROCEDURE DOCUMENTATION, WHERE APPLICABLE, MUST BE SUBMITTED. F) THECONTRACTOR IS RESPONSIBLE FOR SITE SUPERV ISION, COORDINATION OF FIELDACTIVITIES, AND THE SUPPLY OF REQUIRED TECHNICIANS, TOOLS EQUIPMENT,AND RESOURCES NECESSARY TO EXECUTE THE CONTRACT.3.0 TAKEOVER:UPON COMPLETION OF ALL WORK WITHIN THE SCOPE OF THE CONTRACT, THECONTRACTOR MUST NOTIFY DEWA IN WRITING. A CERTIFICATE OF COMPLETION WILLBE ISSUED AFTER A FINAL INSPECTION, CONFIRMING THAT THE WORK HAS BEENACCEPTED AND TAKEN OVER BY DEWA FOLLOWING THE NECESSARY CONDITIONMONITORING CHECKS.4.0 WARRANTY:A) ALL WORK WILL CARRY A WARRANTY OF 8,000 HOURS OF OPERATION OR ONE YEAR, WHICHEVER COMES FIRST. B) THE WARRANTY WILL TAKE EFFECT FROM THEDATE OF DEWAS OFFICIAL TAKEOVER OF THE COMPLETED JOB STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://srm.dewa.gov.ae/sap/opu/odata/sap/ZSRM_RFX_REG_BID_SRV/AttachmentSet(2332601891)/$value
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 116886972
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.