2027 Task Order Contract for Flatwork Street Improvements Package 3 Follow Solicitation .Project Construction May Include But Is Not Limited To: Concrete Curbs, Sidewalks,Driveways, Concrete Retaining Walls-Combination Type, Wheel Chair Ramps, Minorasphalt Milling And Replacement, Removing And Relocating Mail Boxes, Topsoil,Sodding, Striping, Elevated Sidewalks, Sidewalk Pipe Railing, Adjustingexisting Meter Boxes, Valve Boxes And Manholes, Tree Pruning, Removal And/Orreplacement, And Any Other Items Required Due To The Site Conditions Toaccomplish The Project Scope.91347-Construction, Sidewalk And Driveway (Includes Pedestrian And Handicap Ramps);74521-Asphaltic Concrete, Hot Laid Including Bituminous Materials;79050-Sod, Grass;91396-Paving/Resurfacing, Street (Major And Residential);96884-Traffic Control Services (To Include Placement And Removal Of Control Devices);
Contact Information
Contact Person
Melissa Ortega
Contact No.
2102076015
Email
Melissa.Ortega1@Sanantonio.Gov
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 116885229
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.