|
The Subject Of The Order Is Construction Of A Skate Park In Dalachów. The Scope Of The Investment Is The Execution Of Construction Works With Accompanying Supplies In The Town Of Dalachów, 46-325 Rudniki, Plot No.: 160806_2.0004.178, 160806_2.0004.177/4, 160806_2.0004.177/5.1.Subject The Order Includes: 1.1. Earthworks: 1) Removal Of A 15 Cm Thick Layer Of Topsoil, 2) Channeling, Profiling And Compaction Of The Subsoil. The Minimum Soil Compaction Level Is Is = 0.97. 3) Spreading Out Excess Soil 1.2. Concrete Slab: 1) Making A Cut-Off Layer Of 15 Cm Thick Gravel With Profiling And Compacting To Is≥0.98, 2) Making 30X8 Cm Concrete Edges Placed On A Concrete Bench, 3) Making A 12 Cm Thick Sub-Base Made Of C25/30 W8 Concrete Mixture Reinforced With Dispersed Fiber Reinforcement Polypropylene In The Amount Of 1 Kg/M3 Of The Mixture. The Concrete Is Troweled Smooth. 4) Making Expansion Cuts With A Maximum Spacing Of 6.0 X 6.0 M, Cut To 1/3 Of The Thickness Of The Concrete Base. Completing The Expansion Joints Of The Expansion Cords And Filling The Expansion Joints With Polyurethane Mass, 5) Impregnation Of The Board Surface, 6) Board Dimensions: 30.4 M X 21.5 M. In The Shape Of The Letter L.1.3. Pedestrian Route: 1) Channeling 2) Construction Of The Substructure, 3) Construction Of Concrete Edges 30X8 Cm Placed On A Concrete Footing, 4) Laying Of The Surface With Concrete Paving Stones, Thickness. 6 Cm On A Cement-Sand Ballast With An Area Of 45.5 M2. Color And Type To Be Agreed With The Ordering Party.1.4. Delivery And Assembly Of Skate Park Elements: 1) Bank Of Ramps, Dimensions 360X366x120 Cm, 2) Funbox With Grindbox 3/3 + Handrail 2/3, Dimensions 720X366x60 Cm, 3) Straight Handrail (O) Dimensions 400X5x35 Cm, 4) Bank Of 90-Degree Ramps, Dimensions 482X604x120 Cm, 5) Mini Ramp + Spin With Dimensions 937X366x120 Cm. 1.5. Delivery And Assembly Of Small Architecture: 1) Youth Bench, 2 Pieces - Made Of Black Powder-Coated Steel With An Inverted Seat. The Seat Is Made Of Wooden Boards Painted Brown. Dimensions: Element: 1.70 X 0.50 M, Seat Height: 0.90 M, Total Height: 0.95 M, 2) Waste Basket, 2 Pcs. - Basket With Roof And Basket Insert, Made Of Powder-Coated Pipes And Sheet Metal. Dimensions: Element: 0.45 X 0.30 M, Height: 1.00 M, 3) Regulation Board, 1 Piece - Made Of Hpl Board On A Powder-Coated Steel Pipe. Dimensions: Element: 0.65 X 0.10 M, Height: 1.80 M.1. Delivery And Installation Of Lighting Lamps - 2 Pcs.:1) Led Luminaire Power - Minimum 50W,2) Luminous Flux - Minimum 7000 Lm,3) Gel Battery Capacity - Minimum 150 Ah,4) Photovoltaic Panel Power - Minimum 400 W,5) Wind Turbine Power - Minimum 100W,6) Operating Time - Minimum 8 H,7) Operating Autonomy - Minimum 3 Days,8) Sensor Twilight, Dimming System, Working Time Programmer,9) Pole - Galvanized, Height 6M.10) Foundation - System 2. The Detailed Scope Of The Order - Works Is Included In The Design Documentation Of The Technical Specification For The Execution And Acceptance Of Works And The Bi
|