1. The Subject Of The Order Includes Comprehensive Design And Construction In The Design And Build Formula Of A Dust Removal Installation For Part A Of The Waste Reception Hall (Sorting Hall - Facility B7) Along With Related Disassembly, Installation And Industrial Automation Works As Part Of The Task Titled Installation Of A Ventilation System In The Waste Reception Hall With High-Speed Gates. The Full Scope Of The Order Includes In Particular: A) New Dust Removal Installation: Design And Implementation Of A New Dust Removal System For The Sorting Hall, Part A (Waste Reception Hall). B) Automation And Traffic Control: Installation Of Automatic Internal High-Speed Gates With An Integrated Traffic Control System And Additional Warning Signage In Front Of The Zone Covered By The Signaling. The Investment Consists Of The Following Elements: A) Preparation Of Design Documentation: Development Of Construction, Executive And Technical Designs In The Construction, Sanitary, Electrical And Automation Industries, Along With Technical Specifications And Cost Estimates. B) Obtaining All Decisions, Permits And Arrangements Required By Law. C) Obtaining A Building Permit Or Making An Effective Notification Of Works Together With The Necessary Legal And Fire Protection Arrangements. - If It Is Required By Law For The Proper Implementation Of The Investment. D) Obtaining A Map For Design Purposes And Preparing Geotechnical Documentation For Subsoil Research - If It Is Required By Law For The Proper Implementation Of The Investment. E) Carrying Out Construction And Assembly Works: Carrying Out Installation And Construction Works To The Full Extent Described In The Fup. F) Connecting The Dust Extraction Installation, Gates And Traffic Lights To The Power Grid. G) Carrying Out Tests And Measurements: Carrying Out Electrical, Performance And Effectiveness Measurements Filtration Confirmed By Protocols And Measurements Of Noise Emission Of External Devices Into The Environment, Confirmed By Protocols.H) Start-Up Of The Installation: Carrying Out Technological Start-Up, Adjustment Of Systems And Optimization Of Control Algorithms.I) Employee Training: On-The-Job Training Of Staff And Provision Of Complete As-Built Documentation And Certificates.J) Preparation Of As-Built Documentation And An Inspection Report.K) Service And Warranty Inspections: Performing Periodic Warranty Inspections. 3. Equivalent Solutions: Detailed Description In Swz, Chapter 4. The Ordering Party Does Not Allow The Submission Of Partial Offers. 5. The Ordering Party Does Not Envisage Dividing The Order Into Parts. Taking Into Account The Nature Of The Subject Of The Contract, It Should Be Stated That It Is Indivisible. Dividing The Order Into Parts Would Result In Increased Costs, Implementation Difficulties And The Risk Of Delays, And Would Also Be Artificial And Pointless. 6. The Ordering Party Does Not Allow The Submission Of Variant Offers Or Offers In The Form Of Electronic Catalogues.7. T
Contact Information
Address
Wielkopolskie Centrum Recyklingu - Sp. Z O.O. W Jarocinie,Witaszyczki,63-200,Wielkopolskie,Pl416 - Kaliski
Contact No.
627472456
Email
sekretariat@wcr-jarocin.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 116879764
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.