|
The Subject Of The Order Is The Performance Of Construction Works Consisting In The Modernization And Reconstruction Of Hotel Rooms (Renovation Of Bathrooms And Halls In Rooms (Segments) No. 107 And No. 108 On The First Floor Of The Crr Krus Facility, 38-440 Iwonicz-Zdrój, Ul. Ks. Jana Rąba 22, In Accordance With Annexes No. 2A And No. 2B To The Swz. The Task Is To Reconstruction Of Bathrooms (Shower + Washbasin) And Sanitary Facilities (Wc + Washbasin) In Two Rooms 107A+B And 108A+B (Segments - Studio Rooms) On The First Floor Of The Hotel, Into Two Independent, Complete Bathrooms (Shower, Washbasin, Toilet) Separately For Room A And Separately For Room B. New Sanitary And Electrical Installations Should Be Made In The Bathrooms (Adapted To The New Fittings), Lay New Wall And Floor Coverings And Perform Painting Works. In The Segments, The Halls Should Also Be Renovated - Replacement Of Floor Coverings And Painting Of Walls. Demolition Works: - Disassembly Of Sanitary Equipment (Porcelain Washbasins, Toilets With A Porcelain Bowl, Shower Cabins With A Shower Tray, Washbasin Taps, Radiators), - Removal Of Wall Tiles, - Dismantling The Wall Covering From The Farmacel Board, - Dismantling The Plinth From The Fittings, - Chipping Away The Tiles On The Floor, - Dismantling The Farmacel Board And The Ballast, - Removal And Disposal Of Waste And Debris From The Crr Krus Area, Through A Chute Located On The Balcony On The South Side. Construction Works A. Flooring - 0.3Mm Construction Foil Insulation On The Floor, - 5Cm Xps Board Insulation. On The Floor, - Making A Screed With A Minimum Thickness Of 5 Cm On The Floor, - Priming The Substrates Of The Horizontal Surface, - Installing A Waterproofing Tape In The Corners, - Making Waterproofing On The Floor And In The Walls (At Least 30 Cm Above The Floor And In The Corner Of The Shower, - Laying Tiles On The Floor, - Plinth Made Of Tiles On Adhesive Mortar, - Sealing The Tile Joints In The Corners With Silicone. B. Walls - Finishing - Priming Substrates, - Single-Layer Gypsum Plasters On Walls In Rooms With A Floor Area Of Over 5 M2 (Thickness 3 Mm On The Plaster), - Priming Of Substrates, - Painting With Emulsion Paints, Internal Smooth Plasters, Without Priming, Twice - Installation Of 1 Layer Of Plasterboards On The Existing Metal Structure, - Priming Of Substrates, - Facing Of Walls, C. Water And Sewage Installation And Central Heating - Reconstruction Of Water And Sewage Installations C-O, - Delivery And Installation Of A Concealed Toilet Set, - Delivery And Installation Of A Shower Cabin With A Low Shower Tray (Max. 2 Cm) Or Installation Of A Shower Cabin And A Floor Shower Strip, - Delivery And Installation Of A Washbasin With A Cabinet, - Delivery And Installation Of A Washbasin Tap, - Delivery And Installation Of A Shower Tap With A Rain Shower, - Delivery And Installation Of A Radiator - Ladder, - Installation Of A Central Heating Connection To The Bathroom And Relocation Ladders With Central He
|