The Subject Of The Investment Is The Construction Of A Water Pumping Station Along With Sections Of The Technological Water Pipeline Supplying And Discharging Water To The Pumping Station (Suction And Pressure) In Wolica, Chęciny Commune. The Place Of Connection And Power Supply To The Water Pumping Station Is The Existing Water Supply Network Made Of 160 Mm Pvc Pipes Located In Plot No. 646 In Wolica. The Construction Project Includes The Construction Of: 1. Water Pipeline (Suction And Discharge Pipeline) Made Of Pe Pipes Fi160 With A Total Length Of L = 22.0 M2. Electrically Powered Water Pumping Station: A. Underground Water Pumping Station Chamber, Prefabricated, Reinforced Concrete Structure, Internal Dimensions. 3.5 M X 2.5 M And 2.1 M High With Equipment; B. Pre-Meter Electrical Installation Including Power Supply To The Water Pumping Station Control Cabinet From A Cable Connector Designed In A Separate Study With A Yky 4X16 Mm2 Cable. The Area Where The Water Pumping Station With Technological Pipelines Was Designed Is A Green Area Located On A Municipal Plot Next To The Volunteer Fire Department Wolica Fire Station.
Contact Information
Address
Gmina Chęciny,Chęciny,26-060,Świętokrzyskie,Pl721 - Kielecki
Email
gmina@checiny.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 116879714
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.