|
1. The Subject Of The Order Is The Execution Of The Task Entitled: Construction Of Drainage Of The Areas At Ul. Portowa In Radomsko. 2. The Subject Of The Order Must Be Performed In Accordance With The Contract, Construction Design, Including Architectural And Construction Design, Land Development Design, Geotechnical Opinion, And Technical Design; Detailed Design, Technical Specification For The Execution And Acceptance Of Works And In Accordance With The Principles Of Construction Art. 3. The Subject Of The Order Is The Construction Of A Rainwater Drainage Network - Construction Of An Overflow (Drainage System) From The Existing Retention Reservoir Located At Ul. Portowa In Radomsko, Including In Particular: 1) Execution Of Surveying Works (Staking Out, Surveying Services And Post-Construction Surveying), 2) Construction Of A Gravity Storm Sewage Network - Overflow From The Retention Reservoir To The Pumping Station And The Section From The Expansion Well To The Receiver, 3) Construction Of A Pressure Storm Sewerage Network - From The Pumping Station To The Expansion Well, 4) Construction Of Eight Buttons In The Pipes Casings,5) Installation Of A Rainwater Pumping Station In A Concrete Tank,6) Installation Of Concrete Inspection Wells,7) Installation Of A Concrete Expansion Well,8) Construction Of An Internal Power Supply Line,9) Hardening Of The Pumping Station Area With Concrete Cubes,10) Construction Of A Fence For The Pumping Station Along With An Entrance Gate,11) Performance Of Other Works And Works In Accordance With The Contract, Construction Design, Technical Design, Executive Design, Technical Specification Execution And Acceptance Of Works And In Accordance With The Principles Of Construction Practice,12) Topsoiling And Sowing.4. A Detailed Description Of The Subject Of The Order Includes: 1) Agreement - Template/Design - Constituting Appendix No. 9 To The Swz, 2) Construction Design (Land Development Design, Architectural And Construction Design, Geotechnical Opinion) - Constituting Appendix No. 10 To The Swz, 3) Construction Design - Technical Design - Constituting Appendix No. 11 To The Swz, 4) Detailed Design - Constituting Appendix No. 12 To The Swz, 5) Technical Specification For The Execution And Acceptance Of Works - Constituting An Addition No. 13 To Swz.5. The Bill Of Quantities Constituting Appendix No. 14 To The Swz - Due To The Nature Of The Remuneration (Lump Sum) Is Attached For Information Purposes Only - When Pricing The Offer, The Contractor Is Obliged To Take Into Account Any Differences In Quantities Or Missing Items, If The Need To Perform The Work Results From The Construction Design, Including The Land Development Design, Architectural And Construction Design, Geotechnical Opinion And Technical Design, Executive Design, Technical Specifications For The Execution And Acceptance Of Works, Legal Regulations, Principles Of Technical Knowledge, Obligations Indicated In Template/Draft Contract, Including Warranty And
|