|
The Subject Of The Order Is The Construction Of Sports Fields And Athletics Facilities Along With Technical Infrastructure, A Building With Cloakroom And Sanitary Facilities Along With Utilities And Land Development At Primary School No. 9 In Łomża. The Subject Of The Order Includes The Following Works: • Demolition Of A Circular And Straight Track With A Polyurethane Surface, • Demolition Of A High Jump Jump, • Demolition Of A Long Jump Jump With A Sand Pit, • Demolition Of Stands For Spectators, • Demolition Of Hardened Surfaces, • Demolition Of Small Architectural Structures, • Construction Of A Cloakroom And Sanitary Facility Building, • Construction Of A Football Pitch, • Construction Of A Multi-Purpose Pitch, • Construction Of A Straight Track, Long Jump And High Jump Jumps, • Construction Of A Bocce Court, • Construction Of An Outdoor Gym, • Construction Of A Sensory Path, • Construction Of Ball Catches, • Construction Of Communication Routes, • Construction Of Small Architectural Objects, I.E. Benches, Waste Bins, Boards, Stands For The Audience, Shelters For Reserve Players, • Development Of Green Areas. Scope Of Work For The Sanitary Industry: • Construction Of A Water Supply Connection • Construction Of A Connection Sanitary Sewage System• Construction Of A Connection And An External Stormwater Drainage System• Drainage Of Sports Fields, Athletics Track, High Jump Jump• Construction Of Internal Building Installations: - Water Supply And Hot Water Installation - Sanitary Sewage Installation - Heating Installation - Ventilation Installation Scope Of Work In The Electrical Industry:• Construction Of An Internal Wlz Power Line, • Construction Of A Cable Connector, • Construction Of A Lighting Cabinet, • Construction Of A Lighting Installation For A Ball Field Football, Track And Jumping Hill, • Construction Of A Lighting Installation For A Multi-Purpose Pitch And A Bocce Court, • Construction Of A Lighting Installation For Communication Routes. As Part Of The Order, The Contractor Will Be Obliged To Perform Post-Construction Tests Of The Football Pitch. The Scope Of The Tests Includes: - Force Amortization - Vertical Deformation - Rotational Resistance - Rolling Of The Ball - Irregularities - Fiber Height Above The Filling - Filling Height Reference Document According To Fifa Quality Requirements. A Detailed Description Of The Subject Of The Order Is Included In The Design Documentation For Individual Industries And Technical Specifications For The Execution And Acceptance Of Works, As Well As The Elements To Be Taken Into Account When Calculating The Offer Price In Chapter Iv And Xvi Of This Specification. The Documentation On The Basis Of Which The Subject Of The Order Should Be Performed Constitutes Annex No. 7 To The Swz.
|