|
The Subject Of The Order Is To Conduct A Tender Procedure Entitled: Renovation And Adaptation Of Rooms For The Needs Of The Gym Along With The Necessary Sanitary Facilities On The Premises Of The Prison In Łowicz The Investment Will Include: • Removing Scalded Internal Plasters, • Removing Stains And Efflorescence On Walls And Ceilings, • Chipping Away Tiles And Terracotta, • Dismantling Elements Of The Suspended Ceiling, • Removing Uneven Concrete From Floors, • Forging Wooden Or Steel Door Frames Including The Processing Of Door Frames• Replacement And Installation Of Entrance Doors Along With The Processing Of Coverings• Replacement And Installation Of Internal Doors Along With The Processing Of Coverings• Replacement Of Window Frames,• Replacement Or Repair Of Internal Window Sills,• Replacement Of External Sheet Metal Flashings Of Window Frames,• Replacement And Installation Of Ventilation Grilles,• Installation Of New Cement Floors,• Implementation Of Moisture-Proof Insulation Of Floors,• Implementation Of Thermal Insulation Of Floors With Hard Polystyrene, • Execution Of Self-Leveling Leveling Layers For Backfills, • Laying Of Glazed And Terracotta Tiles Together With Plinths, Together With Preparation Of The Substrate For Ceramic Tiles, • Filling, Repairing Or Laying New Internal Plasters, Category Iii, • Bricking Up, Concreting Existing Holes, Holes In Walls And Ceilings Together With Plastering, • Bricking Up Vertical Or Horizontal Grooves And Plastering, • Making A Ceiling Suspended From Plasterboards, • Installation Of Thermal And Moisture-Proof Insulation Of The Ceiling, • Installation Of Thermal Insulation Of Walls As A Supplement To Bricking Up The Gate, • Reconstruction Of Walls And Lintels (Door Joinery), • Installation Of Hpl Partition Walls In Sanitary Facilities, • Installation Of Central Underfloor Heating, • Implementation Of Water And Sewage Installations Together With White Installation, • Implementation Of Electrical Installation Together With White Installation, • Preparation Of The Surface For Painting With Emulsion Paints And Smoothing Uneven Surfaces, • Wiping Existing Internal Plasters, • Priming And Painting Rooms With Emulsion Paint, • Protecting Windows And Doors With Polyethylene Foil, • Washing Windows, Doors And Skylights, • Washing Floors Regardless Of The Type Of Surface Layer Of Floors, • Washing Internal Window Sills, • Washing Equipment After Painting Works, • Removing Rubble And Materials From Demolition And Their Disposal. Bill Of Quantities And Technical Specifications For The Execution And Acceptance Of Renovation And Construction Works Are Attached.
|