|
1. The Subject Of The Order Is The Implementation Of The Investment Called Construction Of A Warehouse Facility In Biechów2. Detailed Description Of The Subject Of The Order: The Subject Of The Order Is The Construction Of A New Warehouse And Garage Facility. The Facility Will Function As A Third-Party Liability Warehouse And Logistics Support In Crisis Situations And Civil Protection. The Investment Will Be Implemented On The Plot No. 3223/1 In Biechów. The Order Includes Construction Works Related To The Construction Of A Single-Story Warehouse And Garage Building With A Steel Structure Placed On A Reinforced Concrete Foundation Slab With Walls Made Of Sandwich Panels Covered With A Gable Roof With A Steel Structure Covered With A Sandwich Panel Along With The Necessary Landscaping, Internal And External Installations, Connections And Accompanying Works In Accordance With The Approved Design Documentation, Including The Bill Of Quantities And Stwiorb. Basic Parameters Facility: Single-Story, Detached Building, Building Height - 7.75 M, Width/Length - 11.80 M, Building Area - 139.24 M 2, Usable Area - 127.24 M 2, Volume - 867.18 M 3. The Scope Of The Order In Particular Includes: A) Performance Of The Necessary Preparatory Works, Including Organization Of The Construction Site, Security Works And Necessary Works Demolition, B) Execution Of Earthworks Related To Land Leveling And Excavations, C) Construction Of A Warehouse And Garage Building With A Steel Structure, Including: - Construction Of A Foundation Slab With Moisture And Heat Insulation, - Construction Of A Steel Structure Of Walls Protected Against Corrosion And Their Casing Made Of 12 Cm Thick External Sandwich Panels, - Construction Of Internal Bathroom Partition Walls, - Construction Of A Steel Roof Structure With A Covering Of 16 Cm Thick Sandwich Panels Cm. - Gable Roof With A Slope Angle Of 25º, Steel Structure Protected Against Corrosion, - Execution Of Sheet Metal Work And Gutters, - Execution Of Finishing Works, Including Floors (Warehouse - Industrial Floor And Bathroom - Tiles), - Installation Of Windows And Doors, - Installation Of Insulated Sectional Garage Doors, - Execution Of Electrical Installation With Connection, Lighting, Heating/Air-Conditioning Installation, Ventilation, Lightning Protection Installation, - Construction Of Water Supply And Sewage Installations Along With Connections And Installation Of White Fittings, D) Delivery Of Equipment (Shelves), E) Performance Of Works Related To Land Development, Including Construction Of An Exit From The District Road, Construction Of An Access Road And Maneuvering Area, Driveways And Strips Around The Building. In Addition, The Contractor Should Take Into Account The Performance Of Cleaning And Reconstruction Works After The Works Carried Out And Any Repairs To Damage. Arising In Connection With Construction Works.3. The Exact Scope Of Works Covered By This Order And Other Information Necessary For The Proper Valuation O
|