|
Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Industry Unit; Power Generators; Service Provider - Servicing Of 380 Kva Ea Set ( Make- Cummins, Model-Model Nta-14- G3 , 380 Kva / 450 Bhp ) By Deploying Skilled Manpower I/C Draining Draining Out Engine Lubricating Oil From Sump, Removing The Fuel Filter , Lube Oil Filters , Air Filter And Cleaning The Ea Set And Accessories, Applying Petroleum Jelly On Battery Terminals Post And Checking The V Belts, Bolts And Coupling, Supplying & Filling The New Engine Lubricating Oil 15W-40 Cf Grade, Supplying & Fixing New Fuel Filter Element And Lubricating Oil Filter Elements ,Servicing Of Air Filter And Radiator , Supplying & Filling Coolant , Testing , Etc Commissioning And Recording The Oil Pressure, Water Temp, Rpm, Volt And Frequency Etc., As Required. , Repairs Of Starter Of Ea Set I/C Servicing Of Starter , Replacement Of Bushes, Washers, Gaskets , Replacement Of Minor Spares , Testing Etc Complete As Required. , Supplying And Fixing Of All Fuel Pipes ( 1 Set Of 4 Nos Pipes From Fuel Tank To Fuel Filter, Fuel Filter To Fuel Pump And Fuel Pump To Engine) I/C Removing Of Old Pipes Etc Complete As Required. , S/F 12 V , 180 Ah Capacity Dg Battery Of Low Maintenance Type Intended For Dg Set Starting Use, Duly Factory Charged & Ready To Use. The Battery Should Have Minimum 2 Years Manufacurers Warranty And Should Of Bsnl Approved / Reputed Make. , Supplying & Fixing Of 24 V , 10 S Spms Type Battery Charger I/C Making Connections Etc As Requird. ( Make- Nhp/Similar Superior Make). , Supplying And Fixing Of 1 Set Of Air Filter Element ( 1 Set Of 2 Nos Filters- Inner & Outer) For 380 Kva Cummins Ea Set I/C Removing Of Old Filters Etc Complete As Required. (Part No- Outer 4055579 & Inner 4055580). , Testing Of Ea Set On Exchange Load For 30 Minutes, Recording Of All Parameters , Checking For Any Oil/Fuel/Water Leakage Etc., Tightning The Filters / Nut Bolts If Required. Etc Complete As Required. , Servicing And Maintenance Of Engine Control Panel Including Tightning All Cables / Busbars / Mccb Connections , Replacement Of Burnt Lugs If Any, Checking / Extending Proper Earthing Connection, Testing On Exchange Load Etc Complete As Required.
|