Engineering Design Services – Existing Renovation: Tga E-Planning Funkhaus Area Houses 2 And 3. House 2: Maintenance And Renovation: - Accessibility Separation Of House 1 And House 3 - Reopening Of The Main Entrance With Restoration Of The Original Staircase - Building Technology Self-Sufficiency Through Separation Of The Divisions: Basement With Its Own Elt Connection Room, Distribution Room, District Heating Transfer Station, House Connection Room With Drinking Water Connection - Building Axis B: Addition Of A Load-Bearing Wall In Some Areas - Building Axis C: Construction Of A Load-Bearing Wall Including Foundation Formation - Construction Of 2 Rental Units Each Floor With Its Own Sanitary Core - At The End Of The Hallway Of The Rental Units, Creation Of An Elt Room With Connection To The Elt Connection Room In The Basement - Room Temperature Control Via Existing Radiators - Closure Of Access From The General Staircase To The Current Toilet Facilities - Upgrade Of Fire Protection - Dismantling Raised Floors In The Studios And Studio Fittings; Instead, Simple Floor Construction - Removal Of Materials Containing Pollutants - If Necessary, Replacement Of The Blown-In Insulation In The Roof Structure - If Necessary, Replacement Of The Wooden Windows Goal: The Character Of The Building Should Be Completely Preserved Without Energy-Related Renovation. House 3 Maintenance And Renovation: - Accessibility Separation Of House 2 And The High-Rise - The Vertical Access Must Be Rearranged To Enable Multiple Rental Units - Reopening Of The Main Entrance - New Entrance In The Joint Area Between Houses 2 And 3 With A Free-Standing Stair Tower (Basement To Top Floor) In The Inner Courtyard - Extension Of The Existing Stairwell (Axis 1-4) Up To The Attic. The Existing Underground Car Park Is Also Accessed Via This Stair Tower. - Internal Existing Staircase (Axis 3-5) From The Ground Floor - 2Nd Floor Is Assigned To The Rental Unit On The 1St Floor. The Further Staircase To The 2Nd Floor Will Be Dismantled - Technical Self-Sufficiency By Separating The Divisions: Basement With Its Own Elt - Connection Room, Distribution Room, District Heating Transfer Station, House Connection Room With Drinking Water Connection - Preservation Of The Studios In The Basement With Construction Of A Second Escape Route On The New Stair Tower - Addition Of Sanitary Cores In Axis 22-24 - At The End Of The Hallway Of The Rental Units, Construction Of An Elt Room With Connection To The Elt Connection Room In The Basement - Fire Protection Upgrade - Removal Of Materials Containing Pollutants - Demolition Of The Flat-Sloped Gable Roof - Construction Of A New Attic With A Roof Terrace, As A Light Roof Construction. Roof Design Facing Hopfenstrasse As A Flat Roof, Slightly Set Back From The Existing Building. To The Inner Courtyard As A Pent Roof. The New Premises Are To Be Used For Br Internal Rental As Scholarship Housing. Further Information Can Be Found In Document Appendix 00 - Project Description_07/29/2026.
Contact Information
Address
Rundfunkplatz 1
Contact No.
+49 89590094912
Email
ausschreibungen.zentraleinkauf@br.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 116826884
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.