|
Tender For Civil Works At Mananchura, Tali, Kuttichira Etc.- 1 Onam Fest 2026- Venue Thali (3 Days Programm) 2 Canopy Tent- 3 Day 1-Canopy Tent- Hire And Labour For Providing And Errecting Hipped Panthal White Coloured For Pavilions, Stalls And Counters As And Where Required To Cover Audience Including All Hire Charges Etc. Complete 4 Day 2-Canopy Tent- Hire And Labour For Providing And Errecting Hipped Panthal White Coloured For Pavilions, Stalls And Counters As And Where Required To Cover Audience Including All Hire Charges Etc. Complete 5 Day 3-Canopy Tent- Hire And Labour For Providing And Errecting Hipped Panthal White Coloured For Pavilions, Stalls And Counters As And Where Required To Cover Audience Including All Hire Charges Etc. Complete 6 Tarpoline Panthal 7 Day 1-Tarpoline Panthalproviding Tarpoline Panthal With Sides Covered, Up To 6M Height In Required Size Etc, For Security And Service Persons Including All Hire Charges Etc. Complete 8 Day 2-Tarpoline Panthalproviding Tarpoline Panthal With Sides Covered, Up To 6M Height In Required Size Etc, For Security And Service Persons Including All Hire Charges Etc. Complete 9 Day 3-Tarpoline Panthalproviding Tarpoline Panthal With Sides Covered, Up To 6M Height In Required Size Etc, For Security And Service Persons Including All Hire Charges Etc. Complete 10 Platform 11 Day 1-Platform Hire And Labour For Providing Platform With 40 Mm Ms Pipe Truss Work With Both Lines And Tying With Ms Pipe And Top Covering With 18 Mm Thick Plywood With Ms Square Pipe Etc. As Per The Directions Ofdepartmental Officers In Charge Including All Cost Of Erecting , Conveyance And Dismantling After Function. 12 Day 2-Platform Hire And Labour For Providing Platform With 40 Mm Ms Pipe Truss Work With Both Lines And Tying With Ms Pipe And Top Covering With 18 Mm Thick Plywood With Ms Square Pipe Etc. As Per The Directions Ofdepartmental Officers In Charge Including All Cost Of Erecting , Conveyance And Dismantling After Function. 13 Day 3-Platform Hire And Labour For Providing Platform With 40 Mm Ms Pipe Truss Work With Both Lines And Tying With Ms Pipe And Top Covering With 18 Mm Thick Plywood With Ms Square Pipe Etc. As Per The Directions Ofdepartmental Officers In Charge Including All Cost Of Erecting , Conveyance And Dismantling After Function. 14 Stage Frontage Carpet 15 Day 1-Stage Frontage Carpet Hire & Labour Charge For Laying Good Quality Floor Mat In The Stage Including All Labour Charges Etc. Complete 16 Day 2-Stage Frontage Carpet Hire & Labour Charge For Laying Good Quality Floor Mat In The Stage Including All Labour Charges Etc. Complete 17 Day 3-Stage Frontage Carpet Hire & Labour Charge For Laying Good Quality Floor Mat In The Stage Including All Labour Charges Etc. Complete 18 Chair Armless 19 Day 1-Chair Armless Supplying And Placing As Per Direction, Plastic Chair Including All Hire And Labour Charges For Replacing The Chair After Use. 20 Day 2-Chair Armless Supplying And Placing As Per Direction, Plastic Chair Including All Hire And Labour Charges For Replacing The Chair After Use. 21 Day 3-Chair Armless Supplying And Placing As Per Direction, Plastic Chair Including All Hire And Labour Charges For Replacing The Chair After Use. 22 Vip Chair 23 Day 1-Vip Chairsupplying And Placing As Per Direction ,Vip Chair Including All Hire And Labour Charges 24 Day 2-Vip Chairsupplying And Placing As Per Direction ,Vip Chair Including All Hire And Labour Charges 25 Day 3-Vip Chairsupplying And Placing As Per Direction ,Vip Chair Including All Hire And Labour Charges 26 Table 27 Day 1-Table Supplying And Placing As Per Direction, Table With Metal Frame And Plywood Top Including All Hire And Labour Charges 28 Day 2-Table Supplying And Placing As Per Direction, Table With Metal Frame And Plywood Top Including All Hire And Labour Charges 29 Day 3-Table Supplying And Placing As Per Direction, Table With Metal Frame And Plywood Top Including All Hire And Labour Charges 30 Teapoy 31 Day 1-Teapoy Supplying And Placing As Per Direction, Teapoy Table With Wood Including All Hire And Labour Charges 32 Day 2-Teapoy Supplying And Placing As Per Direction, Teapoy Table With Wood Including All Hire And Labour Charges 33 Day 3-Teapoy Supplying And Placing As Per Direction, Teapoy Table With Wood Including All Hire And Labour Charges 34 Podium 35 Day 1-Podium Supplying And Placing As Per Direction, Podium With Wood /Steel Including All Hire And Labour Charges 36 Day 2-Podium Supplying And Placing As Per Direction, Podium With Wood /Steel Including All Hire And Labour Charges 37 Day 3-Podium Supplying And Placing As Per Direction, Podium With Wood /Steel Including All Hire And Labour Charges 38 Nilavilakku With Accessories 39 Day 1-Nilavilakku With Accessoriessupplying And Placing As Per Direction, Nilavilakku With Accessories Including All Hire And Labour Charges 40 Day 3-Nilavilakku With Accessoriessupplying And Placing As Per Direction, Nilavilakku With Accessories Including All Hire And Labour Charges 41 Curtain Covering 42 Day 1-Curtain Covering Supplying And Placing As Per Direction, Including All Hire And Labour Charges 43 Day 2-Curtain Covering Supplying And Placing As Per Direction, Including All Hire And Labour Charges 44 Day 3-Curtain Covering Supplying And Placing As Per Direction, Including All Hire And Labour Charges 45 Onam Fest 2026- Venue Kuttichira(3 Days Programme) 46 Canopy Tent- 47 Day 1-Canopy Tent- Hire And Labour For Providing And Errecting Hipped Panthal White Coloured For Pavilions, Stalls And Counters As And Where Required To Cover Audience Including All Hire Charges Etc. Complete 48 Day 2-Canopy Tent- Hire And Labour For Providing And Errecting Hipped Panthal White Coloured For Pavilions, Stalls And Counters As And Where Required To Cover Audience Including All Hire Charges Etc. Complete 49 Day 3-Canopy Tent- Hire And Labour For Providing And Errecting Hipped Panthal White Coloured For Pavilions, Stalls And Counters As And Where Required To Cover Audience Including All Hire Charges Etc. Complete 50 Tarpoline Panthal 51 Day 1-Tarpoline Panthalproviding Tarpoline Panthal With Sides Covered, Up To 6M Height In Required Size Etc, For Security And Service Persons Including All Hire Charges Etc. Complete 52 Day 2-Tarpoline Panthalproviding Tarpoline Panthal With Sides Covered, Up To 6M Height In Required Size Etc, For Security And Service Persons Including All Hire Charges Etc. Complete 53 Day 3-Tarpoline Panthalproviding Tarpoline Panthal With Sides Covered, Up To 6M Height In Required Size Etc, For Security And Service Persons Including All Hire Charges Etc. Complete 54 Stage Frontage Carpet 55 Day 1-Stage Frontage Carpet Hire & Labour Charge For Laying Good Quality Floor Mat In The Stage Including All Labour Charges Etc. Complete 56 Day 2-Stage Frontage Carpet Hire & Labour Charge For Laying Good Quality Floor Mat In The Stage Including All Labour Charges Etc. Complete 57 Day 3-Stage Frontage Carpet Hire & Labour Charge For Laying Good Quality Floor Mat In The Stage Including All Labour Charges Etc. Complete 58 Chair Armless 59 Day 1-Chair Armless Supplying And Placing As Per Direction, Plastic Chair Including All Hire And Labour Charges For Replacing The Chair After Use. 60 Day 2-Chair Armless Supplying And Placing As Per Direction, Plastic Chair Including All Hire And Labour Charges For Replacing The Chair After Use. 61 Day 3-Chair Armless Supplying And Placing As Per Direction, Plastic Chair Including All Hire And Labour Charges For Replacing The Chair After Use. 62 Vip Chair 63 Day 1-Vip Chairsupplying And Placing As Per Direction ,Vip Chair Including All Hire And Labour Charges 64 Day 2-Vip Chairsupplying And Placing As Per Direction ,Vip Chair Including All Hire And Labour Charges 65 Day 3-Vip Chairsupplying And Placing As Per Direction ,Vip Chair Including All Hire And Labour Charges 66 Table 67 Day 1-Table Supplying And Placing As Per Direction, Table With Metal Frame And Plywood Top Including All Hire And Labour Charges 68 Day 2-Table Supplying And Placing As Per Direction, Table With Metal Frame And Plywood Top Including All Hire And Labour Charges 69 Day 3-Table Supplying And Placing As Per Direction, Table With Metal Frame And Plywood Top Including All Hire And Labour Charges 70 Teapoy 71 Day 1-Teapoy Supplying And Placing As Per Direction, Teapoy Table With Wood Including All Hire And Labour Charges 72 Day 2-Teapoy Supplying And Placing As Per Direction, Teapoy Table With Wood Including All Hire And Labour Charges 73 Day 3-Teapoy Supplying And Placing As Per Direction, Teapoy Table With Wood Including All Hire And Labour Charges 74 Podium 75 Day 1-Podium Supplying And Placing As Per Direction, Podium With Wood /Steel Including All Hire And Labour Charges 76 Day 2-Podium Supplying And Placing As Per Direction, Podium With Wood /Steel Including All Hire And Labour Charges 77 Day 3-Podium Supplying And Placing As Per Direction, Podium With Wood /Steel Including All Hire And Labour Charges 78 Nilavilakku With Accessories 79 Day 1-Nilavilakku With Accessoriessupplying And Placing As Per Direction, Nilavilakku With Accessories Including All Hire And Labour Charges 80 Day 3-Nilavilakku With Accessoriessupplying And Placing As Per Direction, Nilavilakku With Accessories Including All Hire And Labour Charges 81 Curtain Covering 82 Day 1-Curtain Covering Supplying And Placing As Per Direction, Including All Hire And Labour Charges 83 Day 2-Curtain Covering Supplying And Placing As Per Direction, Including All Hire And Labour Charges 84 Day 3-Curtain Covering Supplying And Placing As Per Direction, Including All Hire And Labour Charges 85 Onam Fest 2026- Venue Mananchira(5 Days Programme) 86 Stage 40Ft X 30Ft 87 Day 1-Stage 40Ft X 30Fthire And Labour For Providing Platform 1.5M Height Including Steps With Hand Rails For Climbing From Two Sides. Strcuture Made With 40 Mm Ms Pipe Truss Work With Both Lines And Tying With Ms Pipe And Top Covering With 18 Mm Thick Plywood And Overlaying Carpet Etc, As Per Directions. Including All Cost Of Erecting , Conveyance And Dismantling After Function. 88 Day 2-Stage 40Ft X 30Fthire And Labour For Providing Platform 1.5M Height Including Steps With Hand Rails For Climbing From Two Sides. Strcuture Made With 40 Mm Ms Pipe Truss Work With Both Lines And Tying With Ms Pipe And Top Covering With 18 Mm Thick Plywood And Overlaying Carpet Etc, As Per Directions. Including All Cost Of Erecting , Conveyance And Dismantling After Function. 89 Day 3-Stage 40Ft X 30Fthire And Labour For Providing Platform 1.5M Height Including Steps With Hand Rails For Climbing From Two Sides. Strcuture Made With 40 Mm Ms Pipe Truss Work With Both Lines And Tying With Ms Pipe And Top Covering With 18 Mm Thick Plywood And Overlaying Carpet Etc, As Per Directions. Including All Cost Of Erecting , Conveyance And Dismantling After Function. 90 Day 4-Stage 40Ft X 30Fthire And Labour For Providing Platform 1.5M Height Including Steps With Hand Rails For Climbing From Two Sides. Strcuture Made With 40 Mm Ms Pipe Truss Work With Both Lines And Tying With Ms Pipe And Top Covering With 18 Mm Thick Plywood And Overlaying Carpet Etc, As Per Directions. Including All Cost Of Erecting , Conveyance And Dismantling After Function. 91 Day 5-Stage 40Ft X 30Fthire And Labour For Providing Platform 1.5M Height Including Steps With Hand Rails For Climbing From Two Sides. Strcuture Made With 40 Mm Ms Pipe Truss Work With Both Lines And Tying With Ms Pipe And Top Covering With 18 Mm Thick Plywood And Overlaying Carpet Etc, As Per Directions. Including All Cost Of Erecting , Conveyance And Dismantling After Function. 92 German Hanger With Counter Weights 93 Day 1-German Hanger With Counter Weights Providing German Hangers (Pandal) About 9 M Height In Required Size To Cover Audience Including All Hire Charges Etc 94 Day 2-German Hanger With Counter Weights Providing German Hangers (Pandal) About 9 M Height In Required Size To Cover Audience Including All Hire Charges Etc 95 Day 3-German Hanger With Counter Weights Providing German Hangers (Pandal) About 9 M Height In Required Size To Cover Audience Including All Hire Charges Etc 96 Day 4-German Hanger With Counter Weights Providing German Hangers (Pandal) About 9 M Height In Required Size To Cover Audience Including All Hire Charges Etc 97 Day 5-German Hanger With Counter Weights Providing German Hangers (Pandal) About 9 M Height In Required Size To Cover Audience Including All Hire Charges Etc 98 Canopy Tent- 99 Day 1-Canopy Tent- Hire And Labour For Providing And Errecting Hipped Panthal White Coloured For Pavilions, Stalls And Counters As And Where Required To Cover Audience Including All Hire Charges Etc. Complete 100 Day 2-Canopy Tent- Hire And Labour For Providing And Errecting Hipped Panthal White Coloured For Pavilions, Stalls And Counters As And Where Required To Cover Audience Including All Hire Charges Etc. Complete 101 Day 3-Canopy Tent- Hire And Labour For Providing And Errecting Hipped Panthal White Coloured For Pavilions, Stalls And Counters As And Where Required To Cover Audience Including All Hire Charges Etc. Complete 102 Day 4-Canopy Tent- Hire And Labour For Providing And Errecting Hipped Panthal White Coloured For Pavilions, Stalls And Counters As And Where Required To Cover Audience Including All Hire Charges Etc. Complete 103 Day 5-Canopy Tent- Hire And Labour For Providing And Errecting Hipped Panthal White Coloured For Pavilions, Stalls And Counters As And Where Required To Cover Audience Including All Hire Charges Etc. Complete 104 Tarpoline Panthal 105 Day 1-Tarpoline Panthalproviding Tarpoline Panthal With Sides Covered, Up To 6M Height In Required Size Etc, For Security And Service Persons Including All Hire Charges Etc. Complete 106 Day 2-Tarpoline Panthalproviding Tarpoline Panthal With Sides Covered, Up To 6M Height In Required Size Etc, For Security And Service Persons Including All Hire Charges Etc. Complete 107 Day 3-Tarpoline Panthalproviding Tarpoline Panthal With Sides Covered, Up To 6M Height In Required Size Etc, For Security And Service Persons Including All Hire Charges Etc. Complete 108 Day 4-Tarpoline Panthalproviding Tarpoline Panthal With Sides Covered, Up To 6M Height In Required Size Etc, For Security And Service Persons Including All Hire Charges Etc. Complete 109 Day 5-Tarpoline Panthalproviding Tarpoline Panthal With Sides Covered, Up To 6M Height In Required Size Etc, For Security And Service Persons Including All Hire Charges Etc. Complete 110 Platform 111 Day 1-Platform Hire And Labour For Providing Platform With 40 Mm Ms Pipe Truss Work With Both Lines And Tying With Ms Pipe And Top Covering With 18 Mm Thick Plywood With Ms Square Pipe Etc. As Per The Directions Ofdepartmental Officers In Charge Including All Cost Of Erecting , Conveyance And Dismantling After Function. 112 Day 2-Platform Hire And Labour For Providing Platform With 40 Mm Ms Pipe Truss Work With Both Lines And Tying With Ms Pipe And Top Covering With 18 Mm Thick Plywood With Ms Square Pipe Etc. As Per The Directions Ofdepartmental Officers In Charge Including All Cost Of Erecting , Conveyance And Dismantling After Function. 113 Day 3-Platform Hire And Labour For Providing Platform With 40 Mm Ms Pipe Truss Work With Both Lines And Tying With Ms Pipe And Top Covering With 18 Mm Thick Plywood With Ms Square Pipe Etc. As Per The Directions Ofdepartmental Officers In Charge Including All Cost Of Erecting , Conveyance And Dismantling After Function. 114 Day 4-Platform Hire And Labour For Providing Platform With 40 Mm Ms Pipe Truss Work With Both Lines And Tying With Ms Pipe And Top Covering With 18 Mm Thick Plywood With Ms Square Pipe Etc. As Per The Directions Ofdepartmental Officers In Charge Including All Cost Of Erecting , Conveyance And Dismantling After Function. 115 Day 5-Platform Hire And Labour For Providing Platform With 40 Mm Ms Pipe Truss Work With Both Lines And Tying With Ms Pipe And Top Covering With 18 Mm Thick Plywood With Ms Square Pipe Etc. As Per The Directions Ofdepartmental Officers In Charge Including All Cost Of Erecting , Conveyance And Dismantling After Function. 116 Stage Frontage Carpet 117 Day 1-Stage Frontage Carpet Hire & Labour Charge For Laying Good Quality Floor Mat In The Stage Including All Labour Charges Etc. Complete 118 Day 2-Stage Frontage Carpet Hire & Labour Charge For Laying Good Quality Floor Mat In The Stage Including All Labour Charges Etc. Complete 119 Day 3-Stage Frontage Carpet Hire & Labour Charge For Laying Good Quality Floor Mat In The Stage Including All Labour Charges Etc. Complete 120 Day 4-Stage Frontage Carpet Hire & Labour Charge For Laying Good Quality Floor Mat In The Stage Including All Labour Charges Etc. Complete 121 Day 5-Stage Frontage Carpet Hire & Labour Charge For Laying Good Quality Floor Mat In The Stage Including All Labour Charges Etc. Complete 122 Metal Barricade 123 Day 1-Metal Barricade Supplying And Fixing Barricade As Per Direction With Steel Including All Labour Charges Conveyance Hire Charges Etc Complete 124 Day 2-Metal Barricade Supplying And Fixing Barricade As Per Direction With Steel Including All Labour Charges Conveyance Hire Charges Etc Complete 125 Day 3-Metal Barricade Supplying And Fixing Barricade As Per Direction With Steel Including All Labour Charges Conveyance Hire Charges Etc Complete 126 Day 4-Metal Barricade Supplying And Fixing Barricade As Per Direction With Steel Including All Labour Charges Conveyance Hire Charges Etc Complete 127 Day 5-Metal Barricade Supplying And Fixing Barricade As Per Direction With Steel Including All Labour Charges Conveyance Hire Charges Etc Complete 128 Chair Armless 129 Day 1-Chair Armless Supplying And Placing As Per Direction, Plastic Chair Including All Hire And Labour Charges For Replacing The Chair After Use. 130 Day 2-Chair Armless Supplying And Placing As Per Direction, Plastic Chair Including All Hire And Labour Charges For Replacing The Chair After Use. 131 Day 3-Chair Armless Supplying And Placing As Per Direction, Plastic Chair Including All Hire And Labour Charges For Replacing The Chair After Use. 132 Day 4-Chair Armless Supplying And Placing As Per Direction, Plastic Chair Including All Hire And Labour Charges For Replacing The Chair After Use. 133 Day 5-Chair Armless Supplying And Placing As Per Direction, Plastic Chair Including All Hire And Labour Charges For Replacing The Chair After Use. 134 Vip Chair 135 Day 1-Vip Chairsupplying And Placing As Per Direction ,Vip Chair Including All Hire And Labour Charges 136 Day 2-Vip Chairsupplying And Placing As Per Direction ,Vip Chair Including All Hire And Labour Charges 137 Day 3-Vip Chairsupplying And Placing As Per Direction ,Vip Chair Including All Hire And Labour Charges 138 Day 4-Vip Chairsupplying And Placing As Per Direction ,Vip Chair Including All Hire And Labour Charges 139 Day 5-Vip Chairsupplying And Placing As Per Direction ,Vip Chair Including All Hire And Labour Charges 140 Table 141 Day 1-Table Supplying And Placing As Per Direction, Table With Metal Frame And Plywood Top Including All Hire And Labour Charges 142 Day 2-Table Supplying And Placing As Per Direction, Table With Metal Frame And Plywood Top Including All Hire And Labour Charges 143 Day 3-Table Supplying And Placing As Per Direction, Table With Metal Frame And Plywood Top Including All Hire And Labour Charges 144 Day 4-Table Supplying And Placing As Per Direction, Table With Metal Frame And Plywood Top Including All Hire And Labour Charges 145 Day 5-Table Supplying And Placing As Per Direction, Table With Metal Frame And Plywood Top Including All Hire And Labour Charges 146 Teapoy 147 Day 1-Teapoy Supplying And Placing As Per Direction, Teapoy Table With Wood Including All Hire And Labour Charges 148 Day 2-Teapoy Supplying And Placing As Per Direction, Teapoy Table With Wood Including All Hire And Labour Charges 149 Day 3-Teapoy Supplying And Placing As Per Direction, Teapoy Table With Wood Including All Hire And Labour Charges 150 Day 4-Teapoy Supplying And Placing As Per Direction, Teapoy Table With Wood Including All Hire And Labour Charges 151 Day 5-Teapoy Supplying And Placing As Per Direction, Teapoy Table With Wood Including All Hire And Labour Charges 152 Podium 153 Day 1-Podium Supplying And Placing As Per Direction, Podium With Wood /Steel Including All Hire And Labour Charges 154 Day 2-Podium Supplying And Placing As Per Direction, Podium With Wood /Steel Including All Hire And Labour Charges 155 Day 3-Podium Supplying And Placing As Per Direction, Podium With Wood /Steel Including All Hire And Labour Charges 156 Day 4-Podium Supplying And Placing As Per Direction, Podium With Wood /Steel Including All Hire And Labour Charges 157 Day 5-Podium Supplying And Placing As Per Direction, Podium With Wood /Steel Including All Hire And Labour Charges 158 Nilavilakku With Accessories 159 Day 1-Nilavilakku With Accessoriessupplying And Placing As Per Direction, Nilavilakku With Accessories Including All Hire And Labour Charges 160 Day 5-Nilavilakku With Accessoriessupplying And Placing As Per Direction, Nilavilakku With Accessories Including All Hire And Labour Charges 161 Curtain Covering 162 Day 1-Curtain Covering Supplying And Placing As Per Direction, Including All Hire And Labour Charges 163 Day 2-Curtain Covering Supplying And Placing As Per Direction, Including All Hire And Labour Charges
|