The Subject Of The Order Is To Change The Heating Source In A Residential Building At Ul. Mikołowska 29 In Rybnik. Characteristics Of The Facility Building Area: 255.01 M2 Usable Area Of Apartments: 578.62 M2 Building Volume: 3,062.00 M3 Number Of Floors: 4 Length: 20.12 M Width: 12.60 M Height: Approx. 15.00 M Material Scope Subject Of The Order: 1. General Construction Works: 1) Preparation Of The Construction Site, 2) Securing The Work Site, 3) Demolition Works, 4) Preparatory Works, 5) Masonry Works (Including Bricking Up The Duct After Dismantling The Flue Gas Duct), 6) Plastering Of Walls After The Bricked-Up Holes, 7) Reflecting And Replenishing The Rotten Plaster Of Walls And Ceilings, 8) Reflecting And Making Plinths Of Tiles In The Boiler Room, 9) Reflecting And Execution Wall Cladding With Tiles In The Boiler Room,10) Preparation Of Walls And Ceilings For Painting The Room,11) Replacement Of The 60 Cm X 60 Cm Hatch Of The Cooling Well,12) Finishing And Painting Works On Walls And Ceilings,13) Accompanying And Cleaning Works,14) Removal And Disposal Of Demolition And Post-Construction Materials.2. Installation Works: 1) Dismantling Of The Existing Central Heating Installation In The Basement Rooms, 2) Dismantling Of The Gas Detection System In The Boiler Room, 3) Dismantling Of The Existing Gas Boiler With Fittings, 4) Dismantling Of The Existing Gas Installation In The Boiler Room, 5) Dismantling Of The Flue Gas Discharge Pipe From The Gas Boiler, 6) Installation Of New Central Heating System Distributors With The Necessary Fittings, 7) Installation Of Valves Shut-Off And Regulating Devices Under The Risers,8) Connecting The Risers To The Manifolds Through A New Heating Installation In The Basement,9) Connecting The Internal Central Heating Installation To The Heating Connection In The Boiler Room,10) Plugging The Existing Gas Installation Supplying Gas To The Boiler,11) Installing A Grounding Installation To The Grounding Point/Lightning Protection Installation,12) Cleaning And Renovation Of The Existing Cooling Well In The Boiler Room,13) Installing The Pump Submersible To Hot Water In The Existing Cooling Well, 14) Connecting A New Submersible Pump To The Sewage System, 15) Providing An Independent Electric Power Supply To The Submersible Pump. A Detailed Description Of The Subject Of The Order Includes: Technical Documentation, Technical Specifications For The Execution And Acceptance Of Construction Works, Bills Of Quantities And The Building Permit Decision Constituting Annexes To The Terms Of Reference.
Contact Information
Address
Zakład Gospodarki Mieszkaniowej,Rybnik,44-200,Śląskie,Pl227 - Rybnicki
Email
dzp@zgm.rybnik.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 116793415
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.