1. Subject And Location Of The Orderthe Subject Of The Order Is The Implementation Of Construction Works Consisting In The Thermal Modernization Of A Warehouse Building In Tarnów Opolski On Plots No. 1255/3 And 1256/3, Map Sheet: Km3, District: 0135 - Tarnów Opolski. The Aim Of The Investment Is To Adapt And Prepare The Facility For The Collection And Storage Of Supplies By The Tarnów Opolski Commune For The Needs Of Population Protection And Civil Defense.2. Main Parameters Of The Facility• Type: Detached Building, One-Story, No Basement.• Construction: Steel Frame (2Xc160 Columns, Ipe 100 Purlins, Lattice Trusses).• Building Area: 267.40 M²• Usable Area: 244.40 M² (Main Warehouse: 228.00 M², Handheld: 12.30 M² And 4.10 M²).• Volume: 1,090.00 M³3. Summary Of The Investment Area Area. The Contractor Will Develop The Construction Facilities And Arrange The Equipment In A Way That Takes Into Account The Structure Of The Plot Area:• Existing Development Area (Warehouse Building): 267.40 M² (6.84%)• Existing Development Area (Other Buildings): 296.60 M² (7.59%)• Existing Development Area (Other Buildings): 55.70 M² (1.42%)• Existing/Designed Paved Surfaces: 1,817.00 M² (46.47%)• Biologically Active Area: 1,473.30 M² (37.68%) Total Area Of The Investment Area: 3,910.00 M² (100.00%)4. Basic Scope Of Construction Worksthe Contractor Is Obliged To Perform The Full Scope Of Works Within The Lump-Sum Remuneration, Which Includes In Particular:• Thermal Modernization Of External Walls: Insulation Of The Building With A Complete Façade System.• Roof Modernization: Disassembly Of The Existing One, Construction Of A New Roof Covering With Insulation, Sheet Metal Work And Drainage.• Replacement Of Joinery: Disassembly Of The Existing And Installation Of New Window And Door Joinery.• Installation Works: Comprehensive Modernization Of The Internal Electrical Installation.• Finishing Works: Carrying Out Basic Construction And Finishing Works Inside The Facility Within The Following Rooms:1. Room No. 1 (Main Warehouse): 228.00 M² (Floor Area: 228.00 M²)2. Room No. 2 (Cash Warehouse): 12.30 M² (Floor Area: 12.30 M²)3. Room No. 3 (Cash Warehouse): 4.10 M² (Floor Area: 4.10 M²)4. Total Internal Area Of The Ground Floor: 244.40 M²5. Technical And Construction Conditions• Supporting Structure Of The Facility: Single-Nave Building With A Span Of 9.00 M And A Length Of 28.00 M. The Steel Skeleton Consists Of Columns Made Of 2Xc160 Profiles With Battens, Anchored In The Foundations, Connected In The Heads With Trusses Made Of Angle Sections With Parallel Strips. Roof Structure: Lattice Trusses, Ipe 100 Purlins And Roof Sandwich Panel.6. Limit Parameters Of Thermal And Acoustic Insulationall Insulating Materials And Building Components Used By The Contractor Must Meet The Criteria Of The Technical Conditions (Td) For The Designed Temperature Profile Of 8°C ≤ Ti ≤ 16°C• External Walls: Maximum 0.45 W/(M² ⋅ K) - The Coefficient Must Take Into Account Corrections For Air Voi
Contact Information
Address
Gmina Tarnów Opolski,Tarnów Opolski,46-050,Opolskie,Pl524 - Opolski
Email
ug@tarnowopolski.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 116793368
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.