|
Quotation are invited for Roofing Works Fabrication Lab Block Roofing Works at Al Satwa Yard Roofing Works 1032603424 ROOFING WORKS FABRICATION LAB BLOCK ROOFING WORKS AT AL SATWA YARD 1 ITEM-00001 NECESSARY CO-ORDINATION AND GOVT DEPARTMENTS TO OBTAIN NECESSARY PERMITSAND CLEARANCES, WORK PERMITS, AND AUTHORITY APPROVALS. SITE LOGISTICSARE ALSO PLANNED, SUCH AS MATERIAL STORAGE, DELIVERY SCHEDULES, ANDWASTE DISPOSAL ARRANGEMENTS AND OTHER NECESSARY PREPARAT IONS TO ENSURESMOOTH COMMENCEMENT OF SITE ACTIVITIES. THIS INCLUDES THE DEPLOYMENT OFMANPOWER, TOOLS, EQUIPMENT, AND TEMPORARY FACI LITIES TO THE PROJECT SITEJIJIN ANDATHOTTATHIL JIJIN.ANDATHOTTATHIL@DEWA.GOV.AEO568686851 SYED ASLAM HUSSAIN ASLAM.HUSSAIN@DEWA.GOV.A E04-32-23326 1 LS 2 ITEM-00001 PREPARE AND MONITOR THE PROJECT SCHEDULE. CONDUCT DAILY COORDINATIONMEETINGS WITH THE SITE TEAM, SUPERVISE SITE EXECUTION TO ENSURE QUALITY,SAFETY AND COMPLIANCE WITH 1 LS APPROVED DRAWINGS, REGULAR QA/QC INSPECTIONSAND SUBMISSION OF CLOSING OUT DOCUMENTS. 3 ITEM-00002 PREPARE AND MONITOR THE PROJECT SCHEDULE. CONDUCT DAILY COORDINATIONMEETINGS WITH THE SITE TEAM, SUPERVISE SITE EXECUTION TO ENSURE QUALITY,SAFETY AND COMPLIANCE WITH APPROVED DRAWINGS, REGULAR QA/QC INSPECTIONSAND SUBMISSION OF CLOSING OUT DOCUMENTS.#PROTECTION W ORKS#CLEARING OF DEBRIS FROM SITE ON DAILY BASIS#SCAFFOLDING AND TOOLS#DEMOBILIZATION# 1 LS 4 ITEM-00002 THIS REQUIRES THE DEVELOPMENT OF DETAILED SHOP DRAWINGS BASED ONSURVEYING THE EXISTING STRUCTURAL MEMBERS AND SUPPORTS. THESE DRAWIN GSARE PREPARED IN CLOSE COORDINATION WITH OTHER AUTHORITIES. THE SHOPDRAWINGS WILL BE SUBMITTED S APPROVAL BEFORE EXECUTION ON SITE. 1 LS 5 ITEM-00002 OBTAINING ALL NECESSARY APPROVALS, 1 LS INCLUDING THE SUBMISSION OF MATERIALSAMPLES, TECHNICAL DATA SHEETS, SHOP DRAWINGS (WHERE REQUIRED ), ANDMOCK-UPS FOR THE PROPOSED 100 MM THICK SANDWICH PANELS. THE WORK SHALLINCLUDE SECURING ALL APPROVALS FROM THE ENGINEER/CONSULT ANT AND RELEVANTAUTHORITIES PRIOR TO PROCUREMENT, DELIVERY, AND INSTALLATION, ENSURINGFULL COMPLIANCE WITH THE APPROVED SPECIFICATIO NS AND PROJECTREQUIREMENTS TO THE SATISFACTION OF ALL AUTHORITES. 6 ITEM-00003 DISMANTLE AND REMOVE THE EXISTING CORRUGATED ROOF SHEETS TO FACILITATETHE INSTALLATION OF THE NEW APPROVED SANDWICH PANEL ROOFING SY STEM, ASSPECIFIED BY THE CIVIL DPT. THE SCOPE OF WORK SHALL INCLUDE ALL LABOUR,TOOLS, EQUIPMENT, LIFTING ARRANGEMENTS, PROTECTION OF CEILING UNDER ANDSAFE HANDLING OF MATERIALS SO AS TO AVOID DEBRIS FALLING ON 1.100 M2 TO ROOF OFEXISTING OFFICES BENEATH THE ROOF. ALL DEMOL ISHED MATERIALS SHALL BEREMOVED FROM THE SITE, CARTED AWAY, AND DISPOSED TO THE DUMPING YARD.THE CONTRACTOR SHALL ENSURE THAT THE WO RK IS CARRIED OUT WITHOUT CAUSINGDAMAGE TO THE EXISTING STRUCTURE OR SURROUNDING FACILITIES AND SHALLLEAVE THE AREA CLEAN AFTER EVER Y DAYS WORKS. 7 ITEM-00003 SUPPLY AND APPLY ONE COAT OF APPROVED ANTI-CORROSIVE METAL PRIMER TO THEEXISTING STEEL FRAME STRUCTURE PRIOR TO THE INSTALLATION OF THE NEWROOFING SYSTEM. THE SCOPE OF WORK SHALL INCLUDE THOROUGH SURFACEPREPARATION, INCLUDING THE REMOVAL OF RUST, LOOSE PAINT, DIRT , GREASE,AND OTHER CONTAMINANTS BY APPROPRIATE MECHANICAL CLEANING METHODS, TOENSURE PROPER ADHESION OF THE PRIMER. THE PRIMER SHALL 1.100 M2 BE APPLIEDSTRICTLY IN ACCORDANCE WITH THE MANUFACTURERS RECOMMENDATIONS ANDPROJECT SPECIFICATIONS TO PROVIDE ADEQUATE CORROSION PR OTECTION. 8 ITEM-00003 SUPPLY AND INSTALL APPROVED INSULATED SANDWICH ROOF PANELS THE ENTIREFABRICATION LAB BLOCK AS EXPLAINED AT THE MEETING HELD AT SITE. THESCOPE OF WORK SHALL INCLUDE ALL NECESSARY ACCESSORIES, SUPPORTS,FIXINGS, SEALANTS, AND INSTALLATION MATERIALS REQUIRED FOR A COM PLETEAND WATERTIGHT ROOFING SYSTEM. THE NEW ROOF SHALL BE PROPERLY INTEGRATEDWITH THE EXISTING ROOF STRUCTURE, INCLUDING THE PROVISI ON OF APPROVEDCONNECTION AND JOINT DETAILS TO ENSURE STRUCTURAL INTEGRITY ANDWEATHERPROOF PERFORMANCE. THE WORK SHALL ALSO INCLUDE T HE PROPERCONNECTION OF THE NEW ROOF TO THE EXISTING VERTICAL FLASHING AROUND 1.100 M2 THEENTIRE PERIMETER, WITH ALL JOINTS, LAPS, FLASHINGS A ND SEALING EXECUTEDIN ACCORDANCE WITH THE MANUFACTURERS RECOMMENDATIONS AND APPROVEDINSTALLATION DETAILS TO ACHIEVE A CONTINUOUS, L EAK-PROOF FINISH. 9 ITEM-00003 FACILITATE AND COORDINATE THE ROOF WATER TESTING UPON COMPLETION OF THEROOFING WORKS TO VERIFY THE WATERTIGHT INTEGRITY OF THE INSTA LLEDSYSTEM. THE SCOPE SHALL INCLUDE THE PROVISION OF ALL NECESSARY LABOUR,EQUIPMENT, TEMPORARY WATER SUPPLY ARRANGEMENTS, AND COORDI NATION WITHTHE ENGINEER/CONSULTANT FOR INSPECTION. ANY LEAKS OR DEFICIENCIESIDENTIFIED DURING THE TESTING SHALL BE RECTIFIED BY THE CONTRACTORINCLUDING THE REPLACEMENT OF CEILING IF DAMAGED ON THE FUNCTIONINGOFFICES BELOW AT NO ADDITIONAL COST AND THE ROOF SHALL B 1.100 M2 E RETESTED UNTILSATISFACTORY APPROVAL IS OBTAINED 10 ITEM-00003 SUPPLY AND APPLY ONE COAT OF APPROVED PAINT TO THE EXISTING STRUCTURE.THE SCOPE OF WORK SHALL INCLUDE THOROUGH SURFACE PREPARATION, INCLUDINGSURFACE LEVELLING, LOOSE PAINT, DIRT, GREASE, AND OTHER CONTAMINANTS BYAPPROPRIATE MECHANICAL CLEANING METHODS, TO ENSURE PROPER ADHESION OFTHE PAINT. 750 M2 11 ITEM-00004 SUPPLY AND INSTALL 5TR NON INVERTOR DUCTED SPLIT AC INDOOR AND OUTDOORUNITS WITH REQUIRED HANGING SUPPORTS AND VIBRATION ISOLATORS 1 LS 12 ITEM-00004 SUPPLY AND INSTALL SUCTION AND DISCHARGE COPPER PIPING, INSULATING OFCOPPER PIPE WITH ELASTOMERIC RUBBER INSULATION, CONTROL WIRE #E TC FROMPROPOSED 5TR INDOOR UNIT TO OUTDOOR UNIT LOCATION (APPROX.15 MTR) 1 LS 13 ITEM-00004 SUPPLY AND INSTALL GI MAIN DUCT, BRANCHES, 1 LS MOUTH CONNECTION, DUCTCONNECTOR, FIBERGLASS INSULATION, CANVAS CLOTH WITH VAPOUR BARRIER, HANGING SUPPORTS, THREAD RODS, SOUND ACOUSTIC LINER IN MOUTH#ETC FORSUPPLY AIR DUCTING FOR PROPOSED NEW UNITS. 14 ITEM-00004 SUPPLY AND INSTALL BRANCH VCD/ RING VCD FOR SUPPLY AIR OUTLET. 1 LS 15 ITEM-00004 SUPPLY AND INSTALL PLENUM BOXES, GI RINGS, FLEXIBLE DUCTS#ETC FOR LINEARGRILL FIXING. 1 LS 16 ITEM-00004 SUPPLY AND INSTALL FABRICATED WALL BRACKET WITH PAINTING FOR OUTDOORFIXING 1 LS STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://srm.dewa.gov.ae/sap/opu/odata/sap/ZSRM_RFX_REG_BID_SRV/AttachmentSet(2332601945)/$value
|