|
Underground Work Other Than Tunnels, Shafts And Subways – Civil Engineering Work, Alternative School For The Renovation And Expansion Of The Oggs Overath. 01.0001 Set Up And Clear Construction Site Equipment For The Contractors Work 01.002 Tree Protection, Board Covering, Up To 50Cm 01.003 Set Up, Maintain And Clear Construction Site Fence For The Construction Of The Interim School 01.004 Prepare Construction Site Fence For The Construction Of The Interim School 01.005 Set Up, Maintain And Clear Construction Site Fence For The Dismantling Of The Interim School 01.006 Provision Of Construction Fence For The Dismantling Of The Interim School 01.007 Gate, 2-Wing, W=6M, Deliver, Assembly, Provision For The Construction Of The Container System 01.008 Gate, 2-Wing. Reserved For The Construction Of The Interim School 01.009 Gate 2-Leaf, W = 6M, Deliver, Assemble Reserved For The Dismantling Of The Interim School 01.0010 Gate 2-Leaf. Reserved For The Dismantling Of The Interim School 02.0001 Static Proof 02.0002 Load Plate Pressure Test 02.0003 Proctor Test 02.004 Creation Of A Ground Pipe Planning For The Connection Points Of Dirty Water (Sw) And Rainwater (Rw 02.0005 Condition And Functional Test Of The Ground Pipe 02.0006 Condition And Functional Test Of The Inspection Shaft 03.0001 Upgrading The Meter Cabinet In The Existing Building 03.0002 Construction Site Power Distributor, Metal With Pipe Frame For Outdoor Installation, Set Up, Stored And Dismantled In A Lockable Manner 03.0003 Laying, Connecting And Clearing Power Cables 03.0004 Maintenance Of The System 03.0005 Supplying, Laying And Clearing Fiber Optic Cables 03.0006 Delivering Cat 7 Duplex Cables, Laying And Clearing 03.0007 Establishing The Water Supply For The Container System 04.0001 Create A Pipe Trench T > 0.80 M, Store It On The Side, Install And Compact It In Layers, To Accommodate The Water Pipe 04.0002 Create A Pipe Trench T= >0.60, Store It On The Side, Install It In Layers And Compact It, To Accommodate The Electricity 04.0003 Dismantling The Pipe 04.0004 Core Drilling 150 - 200 Mm With Multi-Section Implementation 04.0005 Pick Up The Paving Area, Clean It, Store It On The Side And Reinstall It 04.0006 Pick Up The Pavement Area, Clean It, Store It On The Side And Reinstall It 04.0007 Excavating Pipe Trenches And Shafts, Including Shoring, Backfilling 04.0008 Loading, Transporting And Disposing Of The Excavation 04.0009 Sewer Pipe As A Joint Piece 04.0010 Shaft Base Dn 100 With Dn 150 Connection Straight According To The New Din 04.0011 Shaft Ring 1M Dn 1000 According To The New Din With Stirrup 04.0012 Shaft Ring 0.75M Dn 1000 According To The New Din With Stirrup 04.0013 Shaft Neck, Cone 0.65 M Dn 1000 According To New Din 04.0014 Concrete Leveling Rings Dn 625 10 Cm / 8 Cm / 6 Cm 04.0015 Begu Cover Class D 400 Round With Ventilation 04.0016 Supply The Filling Floor, Install And Compact It In Layers 04.0017 Supply, Install And Compact Frost Protection Gravel 04.0018 Create Underground Pipes For Dirty/Rainwater, Operate And Dismantle 04.0019 Container Installation Areas Sts Bk0.3 Dpr1 04.0020 Creating Hydraulic Soil Consolidation Or Soil Improvement 04.0021 Loading, Transporting And Recycling Gravel 04.0022 Picking Up, Transporting And Recycling Hydraulically Bound Gravel Layer 05.0001 Construction Site Equipment For Creating The Temporary Parking Area, Pausc
|