|
The Subject Of The Order Is The Reconstruction Of The Internal Courtyard Of The Zst School In Rybnik And The Installation Of Small Architecture - Implementation Of The City-Wide Civic Budget. General Scope Of Work: 1) Taking Over And Securing The Work Area; 2) Geodetic Marking Of Axes, Levels, Elevations, Stand Edges, Foundations, Passages And Slopes; 3) Checking The Compliance Of The Natural Slope With The Design Documentation And Geotechnical Documentation; 4) Removing The Layer Of Topsoil, Turf, Roots And Non-Bearing Soil; 5) Execution Of Earthworks In The Scope Of Slope Profiling, Grading Of The Subsoil, Excavations For Foundations And Local Soil Replacements; 6) Construction Of Drainage, Separation, Filtration, Frost Protection Or Leveling Layers, If Provided For In The Design; 7) Shaping Slopes And Directions Of Rainwater Outflow In Accordance With The Design Documentation; 8) Construction Of Monolithic Or Prefabricated Reinforced Concrete Foundations; 9) Execution Of Concrete Sleepers, Leveling Layers, Grout, Bearings, Elastomeric Washers Or Slip And Separation Layers; 10) Delivery And Assembly Of Prefabricated Reinforced Concrete Elements Of The Stand; 11) Making Connections Between Prefabricated Elements And Connections Of Prefabricated Elements With The Foundation; 12) Execution Of Joints, Fillings, Seals, Expansion Joints And Anti-Corrosion Protection Of Connecting Elements; 13) Construction Of Accesses, Passages, Stairs, Edges, Platforms And Places For People With Disabilities, If Provided For In The Design; 14) Installation Of Seats, Balustrades, Handrails, Barriers, Separating Elements And Seat Numbering, If Provided For In The Design; 15) Protecting Slopes And Adjacent Areas Against Erosion; 16) Quality Control And Measurements; 17) Tidying Up The Work Area; 18) Installation Of An Led Screen With An External Suspended Sound System, 19) Preparation Of Acceptance Documentation, 20) Development Of The Area, Which Includes: A) Dismantling Of Existing Small Architecture - Waste Bins, Benches, B) Replacement Of The Paving Stone Surface, C) Construction Of A Safe Zone - Polyurethane Surface, D) Construction Of A Wooden Platform, E) Care Of Existing Plants, F) Cutting Down Existing Trees According To A Separate Study And Notification, G) Execution Roll Lawn In The Central Part Of The Courtyard, H) Construction Of An Irrigation Installation, I) Construction Of An Eclectic Installation According To The Technical Design Of The Electrical Part, J) Construction Of A Monitoring Installation According To The Technical Design Of The Electrical Part, K) Installation Of Light Points, L) Construction Of Two Sports Stands With A Roof For A Minimum Of 50 People Each (Minimum 100 People In Total), M) Renovation Of The Stairs On The Northern And Southern Walls - Flamed Granite Cladding, N) Installation Of Cameras, O) Installation Of Small Architecture – Waste Bins, Benches, Tables, Deckchairs, P) Installation Of Small Architecture – Outdoor Screen / Tele
|