The Subject Of The Order Are Construction Works As Part Of The Investment Project Titled: Modernization Of Sanitary Rooms, Locker Rooms And Gymnasium At The Public Primary School In Czarnożyce. The Scope Of Works Includes In Particular: Gymnastic Hall - Disassembly Of Existing Sports Equipment, - Protection Of Elements Not Covered By Renovation, - Painting Of The Steel Structure, Walls And Paneling Along With Preparation Of The Substrate, - Replacement Of Door Joinery And Electrical Equipment, - Reassembly Of The Dismantled Equipment, - Delivery And Assembly Of 4 Sports Benches. Sports Equipment Warehouse - Dismantling Of The Existing Grating And Joinery Door, - Installation Of New Steel Doors, - Painting Of Walls, Ceilings And Paneling Along With Preparation Of The Substrate, - Protection Of Floors And Windows For The Duration Of The Works. Locker Room, Bathroom, Wc. - Mens And Womens - Replacement Of Door Joinery, - Replacement Of Sanitary Equipment, Fittings, Radiators, Fans And Installation Elements, - Installation Of Linear Drainage, - Replacement Of Floor And Wall Coverings Along With Repair Of The Substrate, - Painting Works, - Installation Of Shower Cabins And Locker Room Equipment. Bathroom For Teachers, Womens And Mens - Replacement Of Sanitary Equipment And Fittings, - Replacement Of Fans And Installation Elements, - Replacement Of Floor And Wall Coverings Along With Preparation Of The Substrate, - Painting Works, - Replacing Door Joinery. Pe Teachers Room - Replacing Door Joinery, - Replacing Tile Floors, - Painting Works, - Delivery And Installation Of Equipment, Including A Desk, Chairs, Office Cabinet And Cup Display. Communication Line - Painting Works On Walls And Ceilings, Together With The Preparation Of The Substrate. The Contractors Tasks Also Include: - Carrying Out Preparatory, Security, Reconstruction, Assembly, Finishing And Cleaning Works Necessary For The Proper Implementation Of The Subject Of The Order - Making And Installing An Information Board. The Table Should Be Prepared In Accordance With The Guidelines For Fulfilling Information Obligations Applicable To Beneficiaries Of Programs Co-Financed From The State Budget Or State Earmarked Funds (Available At: Https://Www.Gov.Pl/Web/Premier/Promocja). The Contractor Is Obliged To Agree On The Design And Content Of The Board As Well As Its Location With The Ordering Party.4.3. A Detailed Description Of The Subject Of The Order Is Included In Annex No. 1. It Consists Of The Following Documents: - Design Documentation, Taking Into Account Explanations Provided During The Public Procurement Procedure, Technical Specification For The Execution And Acceptance Of Construction Works (Stwiorb), - Bill Of Quantities, Provided That If The Content Of The Design Documentation And Stwiorb Contains Any Provisions Regarding The Said Evidence, The Warranty Period, On-Site Inspection Or Regarding The Conditions For The Implementation Of The Subject Of The Order, In Particular The Rules
|