Structural Shell Work – Shell Construction Work 1 School New Building Europagymnasium Kerpen. - Engineering Services By The Contractor For Construction Site Equipment; Bbq Concept, Prefabricated Reinforced Concrete Parts, Exposed Concrete Components, Waterproof Concrete, Composite Beams, Detailed Scheduling - Measurement Work, Construction Pit And Structure 2000 M2 Construction Road Asphalted, Production 8000 M2 Gravelled Construction Area, Production - Earthworks Site Construction Pit With Sloping Walls As Remaining Excavation Up To The Fine Level, With 250 M3 Of Soil As Filling, Pick Up Hb 1, Remove It, Dispose Of It Or Utilize 4200 M3 Of Soil From Loamy Clay Hb 2, Collect, Remove, Dispose Of Or Recycle 3000 M3 Of Soil From Pleistocene Terrace Hb 3, Collect, Remove, Dispose Of Or Recycle 10,000 M 2 Of Fine Subsoil Produce 570 M Of Drainage Pipes, Collect And Dispose Of Arable Land. 870 M 3 Trenches For Underground Pipes Including Fine Planum And Shoring - Open Dewatering - Civil Engineering Work For The Drainage Of The Building Construction Areas 700 M3 Excavation Of Sewer Trenches 780 M2 Of Trench Shoring For Sewer Trenches 180 M Pp Waste And Rainwater Sewer Incl. Joint, Fittings 8 Pieces. Prefabricated Shafts Dn 400 Pp Incl. Shaft Covers 17 Pieces Stb Shafts Dn1000 Incl. Manhole Covers - Underground Pipes: 200 M Rw Sewer Pipe Dn 110 To Dn 220 Pp-Md Incl. Bends, Connectors, Branches Etc. 770 M Sw Sewer Pipe Dn 110 To Dn 160 Pp-Md Incl. Bends, Connectors, Branches Etc. 55 Floor Ducts With Wall Collars 10 Pieces Wall Ducts With Sealing Inserts 50 Pieces Floor Drains - Empty Electrical Conduits 6000 M Electrical Installation Pipe Incl. Pull Wire And Device Connection Sockets - Earthing System 10000 M Connecting Cables Stainless Steel And Galvanized Incl. Connecting Elements - Building Entries 7 Pieces Electrical Cable Entry 7 Pieces Wall Duct Sanitary Heating - Sealing And Perimeter Insulation 2300 M2 Vertical Building Sealing Bitumen Sheets W2.2E School Building 980 M2 Vertical Building Sealing Bitumen Sheets W2.2E Ventilation Ducts 1250 M2 Horizontal Building Sealing Bitumen Sheets W2.2E Ventilation Ducts 8700 M2 Horizontal Building Sealing With Fresh Concrete Composite System School Building 7150 M2 Xps Perimeter Insulation Horizontal 650 M2 Cfg Perimeter Insulation Horizontally 2250 M2 Waterproof External Walls 1280 M3 Stb External Walls 3200 M3 Stb Internal Walls Incl. Stairwell And Shaft Walls 155 St Stb External Supports 511 St Stb Internal Supports 2630 M3 Stb Roof Ceiling 9180 M3 Stb Ceiling 2830 M3 Stb Joists Incl. Exposed Concrete Requirements, Built-In Parts, Reinforcements - Prefabricated Concrete Parts 75 Pieces Of Prefabricated Staircases 3 Pieces Of Cover Plates For Entry Openings - Masonry Work 2740 M2 Sand-Lime Brick Masonry Not Load-Bearing - Painting Work Technical Areas Ug 3040 M2 Surface Consolidation Of Floor Slab 3920 M2 Wall And Column Coating With Emulsion Paint 3040 M2 Ceiling Coating With Emulsion Paint 2670 M2 Coating Of The Ventilation Ducts Concrete
Contact Information
Address
Jahnplatz 1
Contact No.
+49 2237-580
Email
vergabestelle@stadt-kerpen.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 116643548
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.