|
Architectural Services For Outdoor Areas - Replacement New Building Ogts Parkschule Stadtbergen, Property Planning Of The Outdoor Areas, In Accordance With §§ 38 Ff. Hoai 2021, Lph 1-9, Phased Commissioning. The Subject Of The Order Is Services For Property Planning For Outdoor Facilities, In Accordance With Sections 38 Ff. Hoai 2021, Lph 1-9, Step-By-Step Commissioning. If Necessary, Various Special Services May Also Be Commissioned. - - -The City Of Stadtbergen Is Planning A Replacement Building For Pavilion 7 Of The Parkschule Stadtbergen (Sonnenstraße 7, 86391 Stadtbergen (Access Via Osterfeldstraße)). A New Open All-Day School (Ogts) Is To Be Built For Up To Around 200 Children. Approximately 2,350 M² Gross Floor Area Is Planned For This Purpose. To Begin With, The Existing Building, Consisting Of 3 Group Rooms, Connecting Corridors, Cloakrooms And Sanitary Facilities, Must Be Demolished. The Existing Building Is At Least 35 Years Old And Was Constructed As An Insulated Timber Frame Construction With A Partial Basement. A Fourth Group Room Was Added To The Existing Building, Which Was Built Using A Container Construction Method Consisting Of 3 Containers. These Containers Must Be Relocated Before The New Construction Work Begins. The Current 110 Children Will Optionally Be Looked After In School Or In The Containers During The Construction Project. It Is Not Yet Clear Whether Additional Container Buildings May Need To Be Built To Provide Temporary Care For The Children. - - -The New Building Should Include The Following Rooms:- 8 Group / Homework Rooms - 2 Multi-Purpose Rooms - 2 Multi-Purpose Zone - Preparation Kitchen With Ancillary Rooms (Such As Storage, Staff Toilet, Changing Room, Delivery, Scullery, Cold Storage) - Cloakroom - Garbage Room And Outdoor Storage - Sanitary Facilities (Boys And Girls Toilets + Disabled Toilet). All Areas Not Mentioned In The Room Program (E.G. Hallways, Technical Rooms, Etc.) Must Be Planned In An Economical Size. The Ag Prefers A Solution With At Least A Two-Story Building That Is Durable, Environmentally Friendly And Resource-Saving. Accessibility Is, Among Other Things, By Installing An Elevator. A High Energy Standard Is Aimed For. The Roof Should Be Suitable For A Green Roof And Photovoltaic System. - - -The Outdoor Facilities Of The Ogts Location Must Be Restructured Functionally, Creatively And Technically. The Planning Includes In Particular The Reorganization, Redesign And Construction Of The Unpaved And Paved Outdoor Areas. In Addition To Access Paths, Lounge And Terrace Areas, This Also Includes Car Parking Spaces And Bicycle Parking Spaces. According To The Parking Regulations, One Car Parking Space Is Required For Every 30 Children And 5 Bicycle Parking Spaces Per Group. In The Course Of The New Construction Of The Ogts, It May Also Be Necessary To Adapt Or Plan The Fire Department Access. The Aim Of The Redesign Of The Break And School Yard Is To Create A Functional, Safe, Barrier-Free And Age-Appropriate Outdoor Area With Appropriate Lounge, Exercise, Play And Retreat Areas. Existing Play Equipment And Equipment Elements Must Be Assessed With Regard To Their Condition, Their Further Usability And Their Integration Into The New One
|