|
Overhaul And Refurbishment Work – Renovation Of A Multi-Family Residential Building At Ul. Henryka Pobożny 20 In Wrocław. The Scope Of The Order Includes, Among Others: 1) Renovation Of The Staircase, 2) Renovation Of The Front Façade With Reconstruction Of Architectural Details, 3) Insulation Of The Rear Facade And The Facade Of The Annex, 4) Renovation Of The Ceilings Along With Their Reinforcement And Implementation Of Fire Protection, 5) Renovation And Repair Of Existing Structural Elements Such As Existing Walls And Lintels, 6) Insulation Of The Ceiling Above The Top Floor, 7) Insulation Attic Walls, 8) Replacement Of Worn-Out Window And Door Joinery And Renovation Of Original Joinery, 9) Renovation Of Basements With Installation Of Vertical And Horizontal Moisture-Proof Insulation, 10) Renovation Of The Roof Truss (Replacement Of All Structural Elements) And Roof Covering Along With Rebuilding Chimneys And Performing Sheet Metal Work, 11) Separating And Adapting A Room For The Needs Of A Heating Station, 12) Renovation Of The Building Outbuildings, 13) Renovation Of Commercial Premises, 14) Changing The Structure Of Existing Residential Premises, Including The Separation Of Sanitary Rooms, 15) Ensuring Proper Ventilation In The Building, 16) Renovation Of Chimney Ducts, 17) Construction Of An Elevator Shaft With The Installation Of A Passenger Lift Adapted For Disabled People, 18) Dismantling Of The Gas Installation, 19) Installation Of Cold Water, Hot Water And Circulation Systems, 20) Installation Of The Sewage System Sanitary Installation, 21) Installation Of A Central Heating System Powered By A Heating Substation, 22) Installation Of Electrical Installations, Including: A) Distribution Of Energy In The Building - Wlz Routes, Fire Protection Switch, Main Switchboard Of The Building, Administrative Board With Electricity Metering, Meter Board Of The Service And Residential Part Of The Building, B) Installation Of General And Emergency Lighting, C) Internal Electrical Installations, D) Installation Of Anti-Shock Protection, E) Installation Of Local And Equalizing Connections Main Buildings, F) Telecommunications Installation Of The Building, G) Intercom Installation, H) Rtv Antenna Installation, I) Staircase Smoke Extraction Installation, J) Lightning Protection Installation And Building Earthing. 23) Execution, Delivery And Installation Of An Information Board For Residents - Within 7 Days From The Date Of Taking Over The Construction Site From The Employer, In Accordance With The Instructions For Contractors Rules For Marking Investments Regarding Information For Residents.
|