Supply Of frp modular toilet for lhb coaches to hl3 ( 05 types) , lavatory module for lhb power car coaches. it shall be in compliance to h l3 mdts-44376 rev 01 with corrigendum -1 (design l. no. md46111 dt 16.02.2026) & correction slip (md46111 dt 05.03.2026) process shall be vartm/ vacuum bagging proces s. follow design l. no. md46111 dt 05.03.2026, 23.03.2026 & 29.04.2026 and color shade as per l.no. md22151 dated 05.09.2023.as per drawing no.lp63002 alt nil. installation & com missioning: not required [ warranty period: 30 months after the date of delivery ] ] , frp modular toilet pre assembled for lhb non ac chair car coaches ( 390 li tre). it shall be in compliance to hl3 mdts-44376 rev 01 with corrigendum -1 (design l. n o. md46111 dt 16.02.2026) & correction slip (md46111 dt 05.03.2026) process shall be vart m/ vacuum bagging process. follow design l. no. md46111 dt 05.03.2026, 23.03.2026 & 29.0 4.2026 and colour shade to be followed as per design l. no. md46271 dated 24.09.2024.a s per drawing no. lj63005 alt a & see note 3. installation & commissioning: not required [ warranty period: 30 months after the date of delivery ] ] , frp modular toilet (pre assembled) for lhb slr hog coaches (31 seater),(39 0 litre). it shall be in compliance to hl3 mdts-44376 rev 01 with corrigendum -1 (design l . no. md46111 dt 16.02.2026) & correction slip (md46111 dt 05.03.2026) process shall be va rtm/ vacuum bagging process. follow design l. no. md46111 dt 05.03.2026,23.03.2026 & 29 .04.2026 and follow colour shade as per lno. md46271 dated 18.01.2021.as per drawing no. lr63011 alt a & see note 5. installation & commissioning: not required [ warranty per iod: 30 months after the date of delivery ] ] , frp modular toilet (pre assembled) for lhb gs (455 litre) coaches. it shall b e in compliance to hl3 mdts-44376 rev 01 with corrigendum -1 (design l. no. md46111 dt 1 6.02.2026) & correction slip (md46111 dt 05.03.2026) process shall be vartm/ vacuum bag ging process. follow design l. no. md46111 dt 05.03.2026, 23.03.2026 & 29.04.2026 and col our shade as per l.no. md46271 dated 30.01.2021. as per drawing no. lg63005 alt f & see note 5. installation & commissioning: not required [ warranty period: 30 months after the d ate of delivery ] ] , frp modular toilet (pre assembled) for lhb scn coaches. it shall be in comp liance to hl3 mdts-44376 rev 01 with corrigendum -1 (design l. no. md46111 dt 16.02.2026 ) & correction slip (md46111 dt 05.03.2026) process shall be vartm/ vacuum bagging proc ess. follow design l. no. md46111 dt 05.03.2026, 23.03.2026 & 29.04.2026 and colour shad e as per l.no. md46271 dated 30.01.2021.as per drawing no. ls63008 alt c. installation & c ommissioning: not required [ warranty period: 30 months after the date of delivery ] ]
Contact Information
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 116629689
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.