The Subject Of The Order Is The Modernization Of The Fence Of The Football Pitch In Lubań. The Northern Fence Consists Of 23 High Spans With A Total Length Of 23 X 4.07 M = 96.61 M And A Height Of 7.04 M And 1 Span Of 3.20 M Long, 4.0 M High, The Last Span Is Finished With A Rk80 Post. 7 Posts Are Double, Ready For Installation Ball Catcher, Which Gives The Net Area Of The Ball Catcher 6 X 4.07 M X 6.30 M = 153.85 M2. The Southern Fence Consists Of 21 High Spans With A Total Length Of 21 X 4.07 M = 85.47 M, Constructed As Described Above. In One Of These Spans There Are Two Gates, As In The Photo Below. In Addition, The Fence Also Has 7 Double Posts Adapted For Mounting A Ball Catcher, Which Gives The Net Area Of The Ball Catcher 6 X 4.07 M X 6.30 M = 153.85 M2 - The Same As In The Northern Fence. The Fence Has A Gate And Two Additional Wickets, As 3 Spans With Lengths: Wicket: 1.20 M, Gate: 4.60 M, Wicket: 1.20 M. Height Of Gates: 2 M, Gates: 4.20 M. View Of The Gate And Wickets In The Photo Below. The Eastern Fence Consists Of 3 Sections: 1- 19 Low Bays With A Total Length Of: 19 X 2.16M = 41.04Mm2- 9 Low Bays With A Total Length Of: 9 X 2.16M = 19.44Mm3- 17 Low Bays With A Total Length Of: 17 X 2.16 M = 36.72 Mmthe Western Fence Consists Of 49 Low Spans With A Total Length Of: 49 X 2.16 M = 105.84 M. In Two Spans There Are Wickets Made Of Half A Span - I.E. In The Middle Of The Span There Is An Additional Post And Two Frames, One Part Of The Span Is Fixed, The Other Opens, As In The Photo Below. Scope Of Planned Works:- Cutting Out Mesh Spans In Angle Frames. - Cleaning And Painting The Posts - Cleaning And Painting The Gate And Wicket Made Of Closed Profiles And Flat Bars - Making New Steel Mesh Spans In Angle Frames (Like The Existing Ones) And Mounting Them To The Existing Posts (Including Wickets Made Using This Technology). Structural Steel - S235. The Scope Of Work And The Contractors Responsibility Within The Scope Of This Order Also Includes: 1. Before The Commencement Of The Works, Preparation Of A Safety And Health Protection Plan For The Construction Works Planned For Implementation, If Required, 2. Organization And Development Of The Construction Facilities, 3. After Completion Of The Works, Restoring The Construction Site To Its Original Condition, Dismantling Temporary Structures And Tidying Up The Area, 4. During The Execution Of The Order, Ensure Access To And Use Of The Pitch. 5. When Executing The Order, The Contractor Is Responsible For Removing Branches Colliding With The Fence. Specifying The Description Of The Subject Of The Order: 6. The Ordering Party Allows Heavy Equipment To Enter The Pitch Area. In Such A Case, The Contractor Is Obliged To Protect The Turf Surface Against Damage And Restore It To Its Original Condition On The Day Of Acceptance Of The Works. Moreover, Construction Works Should Be Carried Out In Such A Way As To Enable The Use Of The Pitch (Matches Take Place On Saturdays And Sundays). Therefore, Indiv
Contact Information
Address
Gmina Lubanie,Lubanie,87-723,Kujawsko-Pomorskie,Pl619 - Włocławski
Contact No.
542513312
Email
zamowienia_publiczne@lubanie.com
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 116603114
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.