|
1. The Subject Of The Order Is The Reconstruction And Change Of Use Of An Unused Attic Into A Usable Attic In The Garage Part Of The Building Of The Volunteer Fire Department In Grajów. The Function Of The Building Will Still Consist In Conducting The Activities Of The Volunteer Fire Brigade On The Ground Floor (Garage Part With Two Rooms For Fire Brigade Cars). From The Room No. 0/13, Access To The Attic Will Be Provided Via A New Staircase. In The Attic In Question There Is An Administrative Room With A Kitchenette, A Cloakroom, A Storage Room And A Bathroom For The Use Of Osb Firefighters In Grajów.2. Facility Data: Facility Data Design Status Building Development Area 454.68 M2 Usable Area Of The Attic In Question 79.62 M2 Usable Area Of The Remaining Part Of The Building 583.34 M2 Total Building Area 946.84 M2 Building Height 10.49 M Number Of Storeys 2 Gross Volume Of The Building 3,733.58 M33. The Main Scope Of Works Includes: 3.1) General Construction Works: Demolition Works, Construction Of A Two-Channel And Three-Channel Ventilation Chimney Together With Penetration Through The Roof And Finishing Of The Surface Above The Roof, Insulation Of The Roof Slope, Partition Walls Made Of Brick And Plasterboards, Ordinary Plasters Of Category Iii Cement And Lime, Construction Of A Floor On The Ceiling Along With Laying A Floor Of Stoneware Tiles And Vinyl Panels, Execution Of Cladding Wall In The Room Hygienic And Sanitary, Installation Of Prefabricated Lintel Sbn 120/120, Painting Of Walls And Ceilings, Construction Of Stairs With The Correct Step Height, I.E. 17 Cm, Installation Of Window And Door Joinery, Construction Of Furniture.3.2) Works In The Field Of Sanitary Installations: Construction Of Water And Sewage Installations - Laying Of Pipelines, Insulation, Installation Of An Electric Water Heater, Fittings, Valves, Connection To The Existing One Cold Water Installation, Construction Of Sewage Risers With Cleaners, Exhaust, Construction Of Fire Passages. Through Building Partitions, Conducting Tightness Tests Of Installations, Rinsing, Disinfection And Providing Samples From Water Quality Tests. Execution Of Central Heating Installation Along With The Installation Of Electric Heaters. Installation Of A Complete Ventilation System. Construction And Installation Of A Complete Air Conditioning Installation, Including Indoor And Outdoor Units, As Well As Tightness Tests And Filling Of The Installation. Dismantling And Disposal Of The Existing Sewage Treatment Plant And Delivery And Installation Of A New Sewage Treatment Plant - Parameters According To The Design.3.3) Electrical Installation Works: Delivery And Assembly Of An Electrical Switchboard In Accordance With The Design, Execution Of A Complete Electrical And Lighting Installation, Including Installation Of Fixtures, Plug Sockets, Fire Protection Passage Seals, Installation Of Equalizing Connections, Low Currents, Cctv. Carrying Out Tests And Measurements Of The Installation. Condu
|