|
Construction Work - Ongoing Repair Of Rooms In Semkovo Medical Center At Tu - Sofia. The Subject Of The Order Is The Ongoing Repair Of Rooms In The Semkovo Medical Center At Tu - Sofia. With This Public Procurement, Repairs Will Be Carried Out To Improve The Living Environment And Comfort In The Semkovo Public Health Center. Construction And Repair Works Will Be Carried Out In Rooms, Which Include Dismantling And Construction And Assembly Works In The Architectural Construction And Electrical Parts. The Object Of This Order Falls Into The Fourth Category In The Sense Of Ordinance No. 1 On The Nomenclature For The Types Of Constructions And Zut. The Order Includes The Following Types And Quantities Of Construction Materials: Dismantling Balum, Incl. Cleaning Of The Base - 241.45 M2, Dismantling Of Faience Tiles On The Walls Of The Wc And Bathroom, Including Cleaning Of The Base - 13.00 M2, Dismantling Of Ceramic Tile Flooring Under The Wc And Bathroom, Including Cleaning Of The Base - 2.10 M2, Plasterboard Of The Ceiling Structure, Incl. Putty - 40.10 M2, Construction Of A 30/20 Cm Plasterboard Box For Wires - 2.50 Ml, Thermal Insulation Of 5 Cm Eps (Styrofoam) And Putty With Pvc Mesh Inside The Facade Wall - 18.30 M2, Cement Screed Up To 2.5 Cm Thick, Including Base Preparation And Priming - 273.45 M2, Delivery And Installation Of Laminate Flooring, Incl. Underlay - 241.45 M2, Delivery And Installation Of Skirting Boards For Laminate Parquet, Incl. Corners, Plugs, Joints - 244.09 M.L., Laying Of Faience Lining On Wc And Bathroom Walls, Incl. Preparation Of The Base And Priming/Waterproofing - 13.00 M2, Laying Of Terracotta Flooring Under Wc And Bathroom, Incl. Preparation Of The Base And Priming/Waterproofing - 2.10 M2, Plastering Of Walls, Incl. Preparation Of The Base And Priming - 813.90 M2, Plastering Of Ceilings, Incl. Preparation Of The Base And Priming - 258.75 M2, Double Painting With Latex, Incl. Priming - 1,131.00 M2, Replacement Of Door With Case, Incl. Dismantling Of An Existing One, Delivery And Installation Of A New Door Made Of Mdf 80/200 Cm With A Case - 20.00 Pcs., Replacement Of Electrical Switches, Single For Hidden Installation, Incl. Dismantling Of Existing Ones, Delivery And Installation Of New Ones - 10.00 Pcs., Replacement Of Ceiling Fans, Incl. Dismantling Of Existing Ones, Delivery And Installation Of New Ones - 14.00 Pcs., Manual Loading Of Construction Waste - 9.00 M3, Removal Of Construction Waste - 9.00 M3. The Term For The Execution Of The Construction And Installation Works (Smr) Is No More Than 60 (Sixty) Calendar Days And Begins To Run From The Date Of Signing Of Protocol No. 2 For The Opening Of The Construction Site (Appendix No. 2 To Article 7, Paragraph 3, Item 2 Of Ordinance No. 3/31.07.2003, On Drawing Up Acts And Protocols During Construction). Protocol No. 2 For The Opening Of The Construction Site Shall Be Signed Within 5 Calendar Days From The Date Of Signing The Contract. The Warranty Period For The Completed Construction And Installation Works Is In Accordance With Ordinance No. 2 Of 2003, On Commissioning Of Constructions In The Republic Of Bulgaria And Minimum Warranty Periods For Completed Construction And Installation Works, Facilities And Construction Sites. The Warranty Periods Begin To Run From The Date Of Signing The Final Protocol, Certified
|