|
Construction Work - Carrying Out Construction And Assembly Works For The Purpose Of Current And Emergency Repairs For The Needs Of The Npg On The Kts - Pravets. The Order Includes The Following Types Of Construction And Assembly Works And Estimated Quantity: Dismantling Of Balum - 600 Sq.M., Dismantling Of A Sink - 10 Pcs., Dismantling A Toilet Bowl - 15 Pcs., Dismantling A Mixer Tap - Wall - 20 Pcs., Dismantling Galvanized Pipes 1/2 To 1 In Buildings - 30 M, Dismantling A Light Switch Or Socket - 50 Pcs., Dismantling A Light Fixture - 50 Pcs., Dismantling Of A Cast-Iron Radiator Up To 10 Gliders - 5 Pcs., Lifting And Disconnecting Cables - 10 Pcs., Delivery And Installation Of A Light Switch, Ordinary For Hidden Installation - 50 Pcs., Delivery And Installation Of A Light Switch, Serial For Hidden Installation - 50 Pcs., Delivery And Installation Of A Shuko Contact, For Hidden Installation - 50 Pcs., Delivery And Installation Of A Sink, White, Porcelain, Size Up To 55 Cm - 50 Pcs., Delivery And Installation Of A Sink Faucet - 50 Pcs., Delivery And Installation Of A Shower Faucet - 45 Pcs., Delivery And Installation Of A Toilet Bowl, White, With Back Drain - 25 Pcs., Delivery And Installation Of A Toilet Flushing Machine - 10 Pcs. Delivery And Installation Of A Sink Siphon - 70 Pcs., Delivery And Construction Of A Ppr F 20 Cold Water Pipeline /With Included Fittings/ Pn16 – 30 M., Delivery And Construction Of A Ppr F 20 Hot Water Pipeline /With Included Fittings/ Pn20 – 40 M., Delivery And Construction Of A Ppr F 20 Cold Water Pipeline /With Included Fittings/ - 50 M., Delivery And Installation Of A Ppr Shut-Off Valve Ф20 - 20 Pcs., Delivery And Construction Of Water Pipe From Ppr Ф 20 Hot Water /With Included Fittings/ - 50 M., Delivery And Installation Of Shut-Off Valve 1/2 Spherical - 20 Pcs., Delivery And Installation Of Pvc Pipe Ф50 /With Included Fittings/ - 30 M., Delivery And Installation Of Floor Siphon Brass Ф50 - 10 Pcs., Delivery And Installation Of Soft Connections Ф110 - 50 Pcs., Delivery And Laying Of 2.5 Mm Thick Balum Flooring. With A Textile Base - 400 Sq.M., Painting With Latex Twice On Walls And Ceilings - 500 Sq.M., Bright Painting On Walls Twice With Alkyd Blue Paint - 200 Sq.M., Bright Painting On Wooden Surfaces Twice With Alkyd Paint - 100 Sq.M., Fasagen Painting Twice On The Facade - 100 Sq.M. 50 Sq.M. Plastering Of Walls And Ceilings - 100 Sq.M. Delivery And Installation Of A Door, Aluminum 90/200 Cm, Infill-Chipboard, Without Thermal Bridge - 30 Pcs., Delivery And Installation Of Aluminum Doors 80/200 Cm - 10 Pcs., Delivery And Installation Of Pvc Window Frames, Four-Chamber, White Color, With Double-Glazed Windows, One Low-Emission Glass Heat Transfer Coefficient 1.7 W/M2k Including Fittings, With Aluminum Water-Discharge Window Skirt With A Width Of 210 Mm From The Outside - 160 Sq.M. W/M2k - 20 Sq.M., Delivery And Construction Of A Suspended Ceiling With A Grid Of 60/60 - 150 Sq.M., Transport And Disposal Of Construction Waste - 100 Cu.M., Mechanized Excavation In Earth Soils - 5 Cu.M., Loading And Removal Of Earth Masses To A Landfill - 5 Cu.M., Delivery And Making Of
|