Construction Work – Westfalenpark,Werk In Dortmund, Earthworks And Shell Construction Work. Soil Excavation, Homogeneous Area E1, Layer A/1, Dk0, Loosen, Load, Dispose Of - 994 M³ Soil Excavation, Homogeneous Area E1, Layer A/2, Dk0, Loosen, Load, Dispose Of - 2,077 M³ Soil Excavation, Homogeneous Area E2, Layer U/1, Dk0, Loosen, Load, Dispose Of - 1,348 M³ Difficulty Allowance, Old Pipes 1 Psch In-Situ Concrete, For Base Slab, 20Cm - 610 M³ In-Situ Concrete, For Base Slab, 70Cm - 346 M³ In-Situ Concrete, For Reinforced Concrete Outer Wall, 45Cm - 305 M³ Formwork For Reinforced Concrete Outer Wall, 45Cm - 1,365 M² Reinforced Concrete Outer Wall, 71Cm, Stepped - 2 Pieces Of Reinforcing Steel 500 S, Bar Steel - 106 T Of Reinforcing Steel 500 M, Steel Mesh - 55 T Start Of Construction: No Later Than 12 Working Days After Receipt Of Order Letter End Of Construction: Within 180 Working Days After Start Of Construction
|