|
1. The Subject Of The Order Is The Implementation Of Construction Works Consisting In The Reconstruction Of Rooms In The Building Of The Railway Station In Brusy Along With The Development Of The Area And The Necessary Infrastructure For Passenger Service As Part Of The Task Expansion Of The Integrated Stop In Brusy Co-Financed Under The European Funds For Pomerania 2021-2027 Program, Priority 3. European Funds For A Mobile Pomerania, Measure 3.1. Urban Mobility Of A Regional Program Co-Financed By The European Regional Development Fund. 2. The Subject Of The Order Includes: 1) Development Of The Area Around The Railway Station And Expansion Of The Parking Lot At Ul. Nadrzemem, Including: A) Demolition Of Three Railway Buildings, B) Construction Of An Internal Road, Pedestrian Paths, Exits, Parking Spaces For Buses, Bus Platforms, Parking Spaces For Passenger Cars, Correction Of The Curve Of The Road Ul. Nad Dworcem Next To The Expanded Parking Lot, C) Construction Of A Storm Sewage System Draining The Area With Drainage Of Rainwater To The Existing Rainwater Collector In Ul. Nad Dworcem And Ul. Młyńska, D) Construction Of New Lighting, E) Removal Of Conflicts With The Existing Enea Energy Network, F) Removal Of Conflicts With The Existing Pkp Lighting Network, G) Reconstruction Of The Telecommunications Infrastructure Of Orange Polska S.A., Telsat, Pkp Plk S.A. Colliding With The Expansion Of The Integrated Bus Stop In Brusy, H) Construction Of A Monitoring System For External Zones Around The Railway Station Building And The Expanded Parking Lot, I) Cutting Down Trees Colliding With The Investment) Landscaping By Preparing And Leveling The Area And Planting And Sowing Grass In Accordance With The Greenery Design, 2) Reconstruction Of Rooms In The Railway Station Building, Including: A) Demolition Of Parts Of Existing Partition Walls, Construction Of New Partition Walls, Bricking Up Existing Openings, B) Renovation Of Existing Window And Door Joinery (Indicated In The Project), C) Internal Finishing - Construction Of New Wall And Floor Coverings (Plaster, Tiles, Stoneware, Painting Of Walls And Ceilings, Internal Window Sills, Etc.), D) External Finishing - Sheet Metal Work, E) Construction Of Internal Sanitary Installations - Water Supply, Sanitary Sewage, Heating And Ventilation, F) Construction Of A Water Supply And Sanitary Sewage Connection To The Building, G) Construction Of Internal Electrical Installations, Including: Internal Power Supply Line, Cnbop 160A Fire Protection Switches, Electrical Switchboards, Basic Lighting, Emergency And Evacuation Lighting, Power Supply For Plug Sockets, Call Installation, Power Supply For Heating And Evacuation Devices Ventilation - Automatic Door Opening System. H) Installation Of A Monitoring System, 3) Construction Of 1 Information Board With Dimensions Of 240X120 Cm, On A Steel Frame In Graphite Or Black Color Similar To The Frame Shown In Annex No. 10 To Swz, Including Their Installation. Or Place O
|