Tum General, Development Measure 3 The Construction Project Includes Road Construction Work As Part Of The Es-3 Development Measure On The Site Of The Tum Campus Garching With A Total Area Of Approx. 7,000 M2 In The City Center. In Parallel To The Road Construction Work, Outdoor Facilities Are Being Constructed (Separate Award). The Expansion Area Of The Traffic Facilities Is Approx. 2,000 M2. The Planned Standard Cross-Section Provides For An Enclosed Roadway Width Of Approx. 6.00 M. Essentially The Following Services Must Be Provided (Approx. Details): 1,500 M2 Milling Of Existing Asphalt Pavements, 650 M3 Production Of Frost Protection Layer, 2,000 M2 Production Of Asphalt Base/Top Layer, 500 M Production Of Granite Curbs, Single And Double Rows, Canal Construction: Production Of Road Drainage, 5 Pcs Of Road Gullies With Connecting Pipes And Infiltration Facilities
Contact Information
Address
Ludwigstraße 18, 80539, München
Email
vergabestelle@stbam2.bayern.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 116535513
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.