Wharf Construction Work – Reconstruction Of Ship Access Infrastructure In Basin V Of The Port Of Gdynia. 1. The Subject Of The Order Consists Of Two Parts. Part A Involves The Execution Of Construction Works Consisting In The Implementation Of The Project Called: Expansion Of Access Infrastructure For Ships In Basin V - Phase 2, Based On Design Documentation No. 12350 (Prm) / 03.236.2022 (Tgd) And Construction Permit No. 45/2025/An Of April 28, 2025. Part B Consists In The Design And Subsequent Execution Of Construction Works Described In Functional And Utility Program Entitled: Reconstruction Of The Romanian Quay Together With The Road And Railway Surface And Supplying Ships With Electricity From Land At The Romanian Quay And The United States Along With Obtaining All Required Administrative Decisions. Both Parts, Hereinafter Referred To As The Subject Of The Order, Should Be Implemented Based On The Bim Requirements Specified In The Employers Information Requirements For The Project - Eir Constituting Annex No. 15 To The Swz. Due To The Need To Maintain The Continuity Of The Ports Operation In Terms Of Servicing Ro-Ro Ships, All Works Are Divided Into Stages. The Main Assumption Of The Work Is To Carry Out Construction Works In Parallel Based On The Developed Design Documentation For The Filling Of Basin V And The Existing Construction Permit, Including The Design Of The Scope Specified In The Ffu, Obtaining A Replacement Decision On The Building Permit, And Then Carrying Out Construction Works Enlarged By The Scope Covered By The Ffu. Due To Different Staging Than Assumed In The Project And Partial Overlap Of The Scopes Of Both Projects, Part Of The Project Expansion Of Access Infrastructure For Ships In Basin V - Phase 2 Will Not Be Implemented. The Provided Bills Of Quantities And Cost Estimates Have An Auxiliary Function And Are Not Identical With The Subject Of The Proceedings. The Ordering Party Will Provide The Contractor With An Area Of Approximately 2,000 M2. M2 In The Area Of Basin V. 2. The Subject Of The Order In Part A Under The Name: Expansion Of Access Infrastructure For Ships In Basin V - Phase 2 Includes The Execution Of Construction Works, Which Include: A) Construction Of A New Line Of The Czech Quay Together With New Ramps A And A. B) Landing Of Part Of Basin V. C) Demolition Of Ramp B And Reconstruction Of The Face Of The United States Wharf. D) Dredging Works Including Bottom Strengthening. E) Execution Of Sanitary Works. F) Execution Of Electrical Works. G) Construction Of A Road Surface On The Landed Part, Including Reconstruction Of The Surface After Network Reconstruction And Demolition Works. H) Installation Of Equipment At The Czech Quay. I) Implementation Of Traffic Organization In The Newly Created Area. 3. The Subject Of The Order In The Second Part (B) Entitled: Reconstruction Of The Rumuńskie Quay Together With The Road And Railway Surface And Supplying Ships With Electricity From Land At The Rumuńskie Quay And The United States Includes The Implementation Of The Project Together With Obtaining All Required Administrative Decisions, And Then The Execution Of Construction Works, Which Include: A) Reconstruction Of The Rumuńskie Quay Over A Length Of Approx. 360 M Along With M
Contact Information
Contact No.
+48 586274877
Email
s.wolski@port.gdynia.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 116533027
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.